#MI294685

Building

917 Carlson Pkwy, Minnetonka

IssuedSep 3, 2025
StatusUnknown
Value$775,460
Inspections14
Scope of work

New, 2-unit, 3 story, wood framed condo building

Location context
Fees & payments
Total fees$20
Total paid$20
Timeline
ApprovedSep 3, 2025
IssuedSep 3, 2025
Inspection record
Inspections14
Passed7
Failed0
  1. Feb 6, 2026

    Commercial Insulation

    CORRECTION NOTICE

    InspectorMarshall Lind

    Common areas only, Wall between B garage & common area is not insulated, Talked to contractor on site, All other closed cell spay foam & batt insulation & fire stopping OK
  2. Jan 23, 2026

    Commercial Framing

    APPROVED

    InspectorMarshall Lind

    Framing on Common space on ground level OK
  3. Jan 23, 2026

    Commercial Insulation

    PARTIAL APPROVAL

    InspectorMarshall Lind

    Insulation in common area outside Unit A OK
  4. Jan 16, 2026

    Commercial Insulation

    PARTIAL APPROVAL

    InspectorMarshall Lind

    Unit A only, Exterior wall & fire caulk OK, Need to blow in ceiling. Need common areas done on upper level
  5. Jan 14, 2026

    Commercial Framing

    PARTIAL APPROVAL

    InspectorMarshall Lind

    Framing UNIT B ONLY, Framing OK, NEED FIRE CAULK AROUND SPRINKLER PIPE/HOLE WHERE WIRE WAS REMOVED ON EAST WALL/AROUND ELECTRICAL WIRES IN FLOOR IN STAIR AREA
  6. Jan 12, 2026

    Commercial Framing

    PARTIAL APPROVAL

    InspectorMarshall Lind

    Unit A ONLY, Trusses/Beams/Headers/Framing OK, Needs Fire blocking
  7. Jan 6, 2026

    Commercial Framing

    SEE COMMENTS

    InspectorBrian Stemwedel

    917 and 921 are exactly 10' apart Unit a ductwork in attic covered with SPF insulation. Need to verify Flame/ Smoke for SPF is compliant with 2601.4.1.6 MSBC (covered with ignition barrier)
  8. Dec 29, 2025

    Commercial Framing

    SEE COMMENTS

    InspectorBrian Stemwedel

    Check separation distance between 917 and 921 and make sure it is a min (or exactly 10' apart) if exterior walls are closer than 10', then per Table 602 MSBC 1 hour fire resistance rating is required from both sides [705.5 MSBC] distance is measured to lot line between buildings. if less than 5' from property line, then openings are also limited to 15% of exterior wall area
  9. Dec 9, 2025

    Commercial Framing

    CORRECTION NOTICE

    InspectorMarshall Lind

    SHEATHING INSPECTION ONLY, One edge on North side from second floor up to roof needs to be nailed 4 inches on center
  10. Dec 8, 2025

    Commercial Framing

    CALL FOR REINSPECTION

    InspectorMarshall Lind

    SHEATHING INSPECTION ONLY, No one new about inspection, Didn't t know where braced walls are or nailing schedule, Talked to Randy & Jared
  11. Oct 8, 2025

    Foundation/Waterproofing

    SEE COMMENTS

    InspectorDan Menth

    Underslab vapor barrier/ radon ok
  12. Sep 26, 2025

    Poured Wall

    APPROVED

    InspectorBrian Stemwedel

    Foundation waterproofing (spray applied asphalt) Foundation insulation, 2" rigid foam (R10) also noted poly slip sheet
  13. Sep 22, 2025

    Poured Wall

    APPROVED

    InspectorBrian Stemwedel

    8" poured wall. #4 verts 48"O.C. w/ (2) #4's (Top and Bottom) informed contractor of requirement to keep verts 3" max distance from soil side of wall( also require 3" min cover to earth, so bar has a tight tolerance of 3" from face of wall on soil side)
  14. Sep 17, 2025

    Commercial Footing

    SEE COMMENTS

    InspectorChris Weaver

    FOOTING AS PER PLAN CONCERNS OVER RETAINING WALLS