#MG400711

Building

9800 Fernbrook La N, Maple Grove

IssuedApr 9, 2025
StatusUnknown
Value$78,000,000
Inspections55
Scope of work

Add, 50,000 sf of additions & renovations throughout the building (includes storm shelter)

Location context
Parcel1011922220007
Coordinates45.13466, -93.46202
Loading map…
198 nearby
This permitNearby
Fees & payments
Total fees$186,330.37
Total paid$186,330.37
Timeline
ApprovedApr 8, 2025
IssuedApr 9, 2025
Inspection record
Inspections55
Passed0
Failed0
  1. Feb 25, 2026·10:30 AM - 12:00 PM

    Framing - 90

    scheduled

    InspectorDJ Hennessey

  2. Feb 18, 2026·10:30 AM - 12:00 PM

    Framing - 90

    scheduled

    InspectorDJ Hennessey

  3. Feb 4, 2026

    Above Ceiling

    Partial Inspection

    InspectorDJ Hennessey

    Area "E" hard lid areas in locker rooms (showers, office) Also all spray applied fire proofing is complete on locker room roof structure.
  4. Jan 26, 2026

    Framing - 90

    Partial Inspection

    InspectorDJ Hennessey

    Checked nail plates in area "E" locker rooms north of grid L
  5. Jan 21, 2026

    Framing - 90

    Partial Inspection

    InspectorDJ Hennessey

    Framing in Area "E" locker rooms north of grid L
  6. Jan 21, 2026

    Fire block/caulking

    Partial Inspection

    InspectorDJ Hennessey

    Fireproofing of bar joists in Weight room E101
  7. Jan 6, 2026

    Underslab Vapor Barrier

    Partial Inspection

    InspectorDJ Hennessey

    Area "C" Main corridor and all Northeast of grid line C10
  8. Jan 6, 2026

    Fire block/caulking

    Partial Inspection

    InspectorDJ Hennessey

    Storm shelter addn: 2nd floor fire proofing on steel I-beams, columns, and structural weld plates
  9. Jan 6, 2026

    Site

    Consultation

    InspectorDJ Hennessey

    Met on-site with GC & AOR, re: areas where new construction meets existing roof construction. Existing structural columns & beams are fire protected but the bar joists are not (IBC T601, roof construction and associated secondary members require 1hr protection for types II-A & I-B). Existing bar joists are enclosed in 1hr UL system. New construction all steel has spray applied 1hr. AOR will email all UL info (existing & proposed) with plan showing areas where transition occurs for BO approval of methods prior to submitting plan change for review..
  10. Dec 17, 2025

    Framing 60

    Partial Inspection

    InspectorDJ Hennessey

    Storm shelter addn: Checked precast wall panel gaps (per ICC 500), no discrepancies noted.
  11. Dec 17, 2025

    Underslab Vapor Barrier

    Partial Inspection

    InspectorDJ Hennessey

    Area "C" Main floor of storm shelter Northwest of grid line CJ and Southwest of C10
  12. Dec 17, 2025

    Fire block/caulking

    Partial Inspection

    InspectorDJ Hennessey

    Storm shelter addn: 3rd floor fire proofing on steel I-beams, columns, and structural weld plates
  13. Nov 13, 2025

    Site

    Correction notice

    InspectorDJ Hennessey

    Inspected exercise room on north side of gymnastics gym for occupant use.
  14. Oct 1, 2025

    Foundation-Exterior

    Partial Inspection

    InspectorDJ Hennessey

    OK to backfill footings from 9/29/05
  15. Sep 30, 2025

    Underslab Vapor Barrier

    Partial Inspection

    InspectorDJ Hennessey

    Area E addition (Room E100/E140)
  16. Sep 29, 2025

    Footing

    Partial Inspection

    InspectorDJ Hennessey

    remainder of footings for storm shelter in area C
  17. Sep 17, 2025

    Site

    Partial Inspection

    InspectorDJ Hennessey

    No change from yesterday. Pouring wall section that was inspected yesterday
  18. Sep 17, 2025

    Poured Wall

    Partial Inspection

    InspectorDJ Hennessey

    Stem walls formed from grid C.11 to C.3 (CG to CJ) C.3 to C.1 not ready yet.
  19. Sep 15, 2025

    Poured Wall

    Partial Inspection

    InspectorDJ Hennessey

    Progress check on storm shelter foundation (Area C). Installing #11 hooks in column piers (currently working along gridline C.1)
  20. Sep 11, 2025

    Poured Wall

    Partial Inspection

    InspectorDJ Hennessey

    Checked stem wall rebar, same section as 9/8 footings. Rebar only, wall forms not set yet. Storm shelter (Gray area in "Area C"): all from grid line CG to the south and east (except column pads at C.7-CG & C.5.6-CG) and all from grid line C.3 to the south and west.
  21. Sep 11, 2025

    Footing

    Partial Inspection

    InspectorDJ Hennessey

    Large column pad at east end of existing commons connection to addition.
  22. Sep 10, 2025

    Footing

    Not Ready

    InspectorDJ Hennessey

    Site visit, no new work ready
  23. Sep 9, 2025

    Footing

    Cancel

    InspectorDJ Hennessey

  24. Sep 8, 2025

    Footing

    Partial Inspection

    InspectorDJ Hennessey

    Storm shelter (Gray area in "Area C"): all from grid line CG to the south and east (except column pads at C.7-CG & C.5.6-CG) and all from grid line C.3 to the south and west.
  25. Aug 28, 2025

    Final

    Partial Inspection

    InspectorDJ Hennessey

    Walk through for separation of construction areas from student occupied areas and emergency egress paths.
Show 30 earlier inspections
  1. Aug 25, 2025

    Footing

    Partial Inspection

    InspectorDJ Hennessey

    Large column underpins on north side
  2. Aug 20, 2025

    Footing

    Not Ready

    InspectorDJ Hennessey

    Mucking out excavations for new underpinned footings. Maybe ready tomorrow, probably Friday.
  3. Aug 19, 2025

    Above Ceiling

    Partial Inspection

    InspectorDJ Hennessey

    Mezzanine at main gym
  4. Aug 14, 2025

    Footing

    Partial Inspection

    InspectorDJ Hennessey

    column pads and strip footing from grid G-12 to J-13
  5. Aug 11, 2025

    Site

    Consultation

    InspectorDJ Hennessey

    Met with Job Sup re: temp exiting arrangement during construction when school starts. I reiterated the requirement to keep all required exits free and clear and to protect occupants from dangerous construction hazards. I suggested creating an emergency action plan and coordinating with fire inspector (EL). Overhead construction operations at the north exit would need to cease and potential hazards would need to be immediately removed in the event of an emergency evacuation, or a suitable egress tunnel would need to be in place to protect exiting occupants from falling construction materials.
  6. Jul 31, 2025

    Site

    Consultation

    InspectorDJ Hennessey

    No new work today, pouring walls they formed on 7/29 & 7/30
  7. Jul 30, 2025

    Poured Wall

    Partial Inspection

    InspectorDJ Hennessey

    Finished wall forms between grids C.14 - C.16 and CK - CL
  8. Jul 29, 2025

    Poured Wall

    Partial Inspection

    InspectorDJ Hennessey

    Walls formed between grids C.13 - C.17 and CF - CK Walls partially formed between grids C.14 - C.16 and CK - CL
  9. Jul 28, 2025

    Footing

    Partial Inspection

    InspectorDJ Hennessey

    Under pinned column footings on grid Q between grids 10 and 14
  10. Jul 24, 2025

    Footing

    Not Ready

    InspectorDJ Hennessey

    Nothing new formed today
  11. Jul 23, 2025

    Footing

    Partial Inspection

    InspectorDJ Hennessey

    Pads at C.13-CE and C.5-CK.3
  12. Jul 22, 2025

    Footing

    Partial Inspection

    InspectorDJ Hennessey

    Finished forms between grids C.11 to C.17 and CF to CK also completed area between grids C.14 to C.16 and CK to CL
  13. Jul 21, 2025

    Footing

    Partial Inspection

    InspectorDJ Hennessey

    Partially formed between grids C.11 to C.17 and CF to CK Rained out this morning
  14. Jul 17, 2025

    Poured Wall

    Partial Inspection

    InspectorDJ Hennessey

    short wall and 3 piers next to existing building wall at northern (NE) most corner of building (grid C.11 between CK and CK.5
  15. Jul 16, 2025

    Footing

    Cancel

    InspectorDJ Hennessey

    Rain
  16. Jul 15, 2025

    Poured Wall

    Partial Inspection

    InspectorDJ Hennessey

    Piers and walls in area D, grids F, G, & H 10-12
  17. Jul 10, 2025

    Footing

    Partial Inspection

    InspectorDJ Hennessey

    Columns & strip footings from F-10 to G-12 Columns along existing wall on Grid 10 between G and P.2
  18. Jul 9, 2025

    Footing

    Partial Inspection

    InspectorDJ Hennessey

    column footings next to existing building at NE corner
  19. Jul 9, 2025

    Foundation-Exterior

    Partial Inspection

    InspectorDJ Hennessey

    Poured wall from grid B-7 to B-5 to C-5; grid line 6 from B to K; grid L-5 to L-7
  20. Jul 8, 2025

    Footing

    Cancel

    InspectorDJ Hennessey

  21. Jul 7, 2025

    Foundation-Exterior

    Partial Inspection

    InspectorDJ Hennessey

    North side addition backfill fdn walls from grid C.5-7 to A-7 to A-9 to D-9 to D-10 to E-10 with interior fdn walls and stoop butts.
  22. Jul 7, 2025

    Poured Wall

    Partial Inspection

    InspectorDJ Hennessey

    Poured wall from grid B-7 to B-5 to C-5; grid line 6 from B to K; grid L-5 to L-7
  23. Jul 3, 2025

    Footing

    Cancel

    InspectorColby Cartney

  24. Jul 2, 2025

    Footing

    Partial Inspection

    InspectorDJ Hennessey

    Interior footing from K-4 to K-5
  25. Jul 1, 2025

    Footing

    Partial Inspection

    InspectorDJ Hennessey

    Strip footing from grid B-7 to B-5 to C-5; grid line 6 from B to K; grid L-5 to L-7
  26. Jun 30, 2025

    Poured Wall

    Partial Inspection

    InspectorDJ Hennessey

    North side addition fdn walls from grid C.5-7 to A-7 to A-9 to D-9 to D-10 to E-10 with interior fdn walls and stoop butts.
  27. Jun 26, 2025

    Site

    Consultation

    InspectorDJ Hennessey

    No inspection. Meeting on site near main entrance designer, contractors, school district, and Eric L (fire). Discussed construction phasing and firewall/dampers.
  28. Jun 23, 2025

    Footing

    Partial Inspection

    InspectorDJ Hennessey

    North side addition strip footings from grid C.5-7 to A-7 to A-9 to D-9 to D-10 to E-10 with interior wall footings and stoop footings
  29. Jun 20, 2025

    Footing

    Cancel

    InspectorColby Cartney

  30. Jun 12, 2025

    Footing

    Partial Inspection

    InspectorDJ Hennessey

    Area "E" addition: grid C-4 to C-2, and C-1 to M-1 to M-2 to P-2 to P-3 to Q-3 to Q~4.2 (connects to existing wall). Includes grids M & P continuing east to existing structure. Correction for C-2 to C-1

Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.