PULLFIRST[THE RECORD]
Permit / Maple Grove← Search
#MG407700

Building

10600 Temple Drive, Maple Grove

IssuedSep 16, 2025
StatusUnknown
Value$5,760,000
Inspections22
Scope of work

New, 17,000 sf new community center

Location context
Fees & payments
Total fees$17,883.04
Total paid$17,883.04
Timeline
ApprovedSep 9, 2025
IssuedSep 16, 2025
Inspection record
Inspections22
Passed1
Failed0
  1. Dec 19, 2025

    Poured Wall

    Partial Inspection

    InspectorRobert Griffin

    Piers at grids A-12, B-12, C-12, and D-12,
  2. Dec 17, 2025

    Footing

    Partial Inspection

    InspectorRobert Griffin

    Isolated pier pad footings grids A-12, B-12, C-12, and D-12, (Contractor stated footing at A-12 had sewer run through, and compromised geopier, but that the engineer assessed soil / foundation suitability, and a follow up report will be provided.
  3. Dec 15, 2025

    Footing

    Cancel

    InspectorRobert Griffin

  4. Nov 26, 2025

    Poured Wall

    Cancel

    InspectorRobert Griffin

  5. Nov 25, 2025

    Poured Wall

    Partial Inspection

    InspectorRobert Griffin

    Interior column piers grid lines B and C, and grid lines 2,3,4,5,6,7,8,9, and 10. (18 piers total). Contractor in process of installing compression ties in stirrups. Special inspector will check ties prior to concrete placement per discussion with contractor.
  6. Nov 24, 2025

    Footing

    No Access

    InspectorDJ Hennessey

    Job sup not here, no footings ready
  7. Nov 20, 2025

    Footing

    Partial Inspection

    InspectorJason Bredenberg

    Interior pads grid lines B/2-4, C/2-4 6 total
  8. Nov 19, 2025

    Footing

    Partial Inspection

    InspectorDylan DeMarais

    Interior pads at grid lines B/5 to B/10 and C/5 to C/10. (12 total)
  9. Nov 18, 2025

    Foundation-Exterior

    Pass

    InspectorDylan DeMarais

    Foundation insulation from grid line 1/A.2 to 4/D.2.
  10. Nov 14, 2025

    Poured Wall

    Partial Inspection

    InspectorRobert Griffin

    Foundation walls approximate grids 1(A.2 to D.2), and D.2(1 to 3.3)
  11. Nov 13, 2025

    Footing

    Partial Inspection

    InspectorKen Nelson

    Grid Line (1): A.2 to D.2
  12. Nov 12, 2025

    Foundation-Exterior

    Partial Inspection

    InspectorRobert Griffin

    Foundation insulation observed for approximate grids A.2 (1.1 to 7.5).
  13. Nov 10, 2025

    Poured Wall

    Correction notice

    InspectorDylan DeMarais

    Foundation wall A.2 (1.1 - 7.5), correction for pier column at A.2 - 2 engineering needed
  14. Nov 7, 2025

    Poured Wall

    Partial Inspection

    InspectorRobert Griffin

    Foundation wall approximate grids A.2 (1.1 to 7.5). Discussed with contractor that special inspector is required to be on site to observe rebar and cast cylinders for concrete placement. (not all form pans installed yet during today's inspection)
  15. Nov 5, 2025

    Foundation-Exterior

    Partial Inspection

    InspectorRobert Griffin

    Foundation insulation approximate grid lines A.2(7.5 to 11), 11(A.2 to D.2), and D.2(4.5 to 11).
  16. Oct 31, 2025

    Footing

    Partial Inspection

    InspectorRobert Griffin

    Correction to widen misplaced previously poured footing between gridlines 2 and 3 on North side of structure. (Contractor provided documentation from SER and stated special inspector would be arriving to witness post installed rebar per engineer's fix)
  17. Oct 29, 2025

    Poured Wall

    Partial Inspection

    InspectorKen Nelson

    Walls and Piers along grid line D. From grid line12 to between grid lines 1 & 2
  18. Oct 24, 2025

    Poured Wall

    Partial Inspection

    InspectorRobert Griffin

    Walls/ integral piers, approximate grids ((A.2-7.5) to (A.2-11)), and ((11-A.2) to (11-B.3))
  19. Oct 22, 2025

    Footing

    Partial Inspection

    InspectorDylan DeMarais

    Strip footings and pads from A.2/6.5 to before corner pad (stopped 6-8 feet from corner)
  20. Oct 17, 2025

    Footing

    Partial Inspection

    InspectorRobert Griffin

    Footings including integral pier pad footings grids D.2(1.7 to 11), A.2(6.5 to 11), and 11(A.2 to D.2). Contractor plans to check with SER for use of 6" chairs to support rebar, plans show 3" distance specified, special inspector must also check soil as rain has occurred since the time footings were excavated.
  21. Oct 16, 2025

    Footing

    Partial Inspection

    InspectorDylan DeMarais

    Inspected strip footing from grid line 11/A.2 (started after F1 pad) to 1/D.2 (stopped prior to F2 pad), no rebar matte in place, #8 dowels not in place for pier columns, missing #5 rebar at footing jump between 'C' - 'D' @ 11.
  22. Oct 15, 2025

    Footing

    Cancel

    InspectorDylan DeMarais

Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.