PULLFIRST[THE RECORD]
Permit / Maple Grove← Search
#MG411282

Building

18550 70th Way N, Maple Grove

IssuedOct 10, 2025
StatusUnknown
Value$1,900,000
Inspections16
Scope of work

New, New wood framed free-standing restaurant building

Location context
Parcel3011922310103
Coordinates45.08220, -93.51513
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$5,783.3
Total paid$5,783.3
Timeline
ApprovedOct 10, 2025
IssuedOct 10, 2025
Inspection record
Inspections16
Passed8
Failed2
  1. Mar 24, 2026

    Final

    Pass

    InspectorRobert Griffin

  2. Feb 20, 2026

    Final

    Partial Inspection

    InspectorRobert Griffin

    See TCO for remaining items.
  3. Feb 3, 2026

    Above Ceiling

    Pass

    InspectorDylan DeMarais

  4. Jan 8, 2026

    Lath (if required)

    Partial Inspection

    InspectorDylan DeMarais

    Lath on south-S.E. walls only, Viewed photos of EIFS application, mortar was applied vertically for drainage.
  5. Jan 5, 2026

    EIFS

    Partial Inspection

    InspectorDJ Hennessey

    looked at base coat (Sto Gold Coat) over sheathing. Talked to contractor, he will schedule inspection for lath before stone install and take pictures of each installation layer of StoTherm ci EIFS system.
  6. Dec 29, 2025

    Insulation

    Pass

    InspectorDJ Hennessey

  7. Dec 22, 2025

    Sheathing

    Pass

    InspectorDylan DeMarais

  8. Dec 22, 2025

    Framing 60

    Pass

    InspectorDylan DeMarais

  9. Dec 19, 2025

    Insulation

    Not Ready

    InspectorRobert Griffin

  10. Dec 16, 2025

    Framing 60

    Correction notice

    InspectorDylan DeMarais

  11. Nov 12, 2025

    Poured Floor

    Pass

    InspectorColby Cartney

  12. Nov 10, 2025

    Underslab Vapor Barrier

    Correction notice

    InspectorDylan DeMarais

    Re-inspection needed after first pour of floor at cooler/freezer area slab.
  13. Nov 3, 2025

    Foundation-Exterior

    Pass

    InspectorDJ Hennessey

  14. Oct 28, 2025

    Poured Wall

    Pass

    InspectorKen Nelson

  15. Oct 24, 2025

    Poured Wall

    Failed

    InspectorJason Bredenberg

    Need more info from engineer on Pier dowels, rebar needs to be tied, piers are to close to inner wall, engineer to address.
  16. Oct 15, 2025

    Footing

    Failed

    InspectorDylan DeMarais

    Concrete was wrong PSI, 4000 PSI is required per engineering, 3000 PSI was delivered. Engineer to sign off on the mix used and for using epoxy for pier dowels instead of hook dowels. UPDATE - ENGINEER OKAYED THE 3000PSI, DID NOT APPROVE EPOXY FOR PIER DOWELS. MUST OPEN PADS TO INSTALL HOOK DOWELS PER ENGINEERS DETAIL DATED 10/16/25.

Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.