Permit / Edina← Search
#ED213178Building
4211 Alden Dr, Edina
IssuedJul 24, 2024
StatusUnknown
Value$16,500
Inspections19
Scope of work
Other Demolition (645-649), DEMO HOME/MOVE: Escrow Paid
Location context
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$82.5
Total paid$82.5
Timeline
ApprovedJul 24, 2024
IssuedJul 24, 2024
Inspection record
Inspections19
Passed15
Failed0
- Oct 14, 2024
Escrow
Approved, w/ CommentsInspectorLindsay Evans
OK to issue escrow refund. Per Water Resources: No well likely on the property based on the age of the home and original watermain.
- Oct 14, 2024
Building Final
Approved, w/ CommentsInspectorNate Borwege
Escrow refund of $2500 Approved.
- Oct 8, 2024
Erosion Ctrl/Const Entrance
Approved, w/ CommentsInspectorLindsay Evans
Overall site looked good for escrow refund.
- Oct 3, 2024
Escrow
Progress ReportInspectorLindsay Evans
Received online escrow refund request. Working to process.
- Sep 25, 2024
Construction Fence
ApprovedInspectorLindsay Evans
- Sep 25, 2024
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Sep 11, 2024
Demo Final
ApprovedInspectorGodwin Annin
- Old house demoed and new footing in progress
- Sep 3, 2024
Construction Fence
ApprovedInspectorLindsay Evans
- Sep 3, 2024
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Aug 26, 2024
Construction Fence
ApprovedInspectorLindsay Evans
Fence along same area. Looks good and all that is needed at this time.
- Aug 26, 2024
Erosion Ctrl/Const Entrance
Progress ReportInspectorLindsay Evans
IP device has been updated to orange bag w/bumper. Street has been cleaned. *Contractor said new rock will be installed when excavation crew comes to start the foundation.
- Aug 19, 2024
Demo Final
ApprovedInspectorPeter Akmenkalns
when footings start escrow can be applied for
- Aug 16, 2024
Construction Fence
Approved, w/ CommentsInspectorLindsay Evans
- Aug 16, 2024
Erosion Ctrl/Const Entrance
Not ApprovedInspectorLindsay Evans
House has been demo'd -Need to install new IP device. Current type is causing drainage issues and has been torn back to allow water flow into CB. -Existing driveway has been removed. Need to install a rock entrance -Clean up all sediment on the driveway apron and street along the curb
- Jul 26, 2024
Erosion Ctrl/Const Entrance
Approved, w/ CommentsInspectorLindsay Evans
Overall, site looked good. Have not started demo yet.
- Jul 8, 2024
Preconstruction
Approved, w/ CommentsInspectorLindsay Evans
Per Water Resources: No well likely on the property based on the age of the home and original watermain.
- Jun 14, 2024
Preconstruction
Partial Approval w/ CommentsInspectorLindsay Evans
Site looked good. EC in place. Site sign up. Using existing driveway until demo is complete or no longer viable. IP installed in catch basin ID2594... may need to change the type of IP device if current one doesn't allow for enough flow rate into CB. Pre demo photos uploaded in PDox.
- Jun 14, 2024
Tree Protection (call 952-826-0308)
Progress ReportInspectorLindsay Evans
During my pre demo inspection, tree protection appeared to be installed with either safety fence or by silt fence installation on all required trees outlined in the tree escrow permit.
- Jun 7, 2024
Tree Plan
No Inspection RequiredInspectorLindsay Evans
Per Forestry: NRMP ED213179, Preserving 54 trees, remove 1. LB
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.