PULLFIRST[THE RECORD]
Permit / Edina← Search
#ED213180

Building

4211 Alden Dr, Edina

IssuedAug 14, 2024
StatusUnknown
Value$1,800,000
Inspections50
Scope of work

New, New Home with deck

Location context
Parcel0702824410078
Coordinates44.92654, -93.33240
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$9,000
Total paid$9,000
Timeline
ApprovedAug 13, 2024
IssuedAug 14, 2024
Inspection record
Inspections50
Passed45
Failed0
  1. Nov 18, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorAndy Reinisch

    Approved Inspected by Francis Killen
  2. Aug 18, 2025

    Temporary CO

    No Inspection Required

    InspectorErin Rust

    TCO Paid for and email sent with certificate.
  3. Aug 12, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorScot Jandro

  4. Aug 12, 2025

    Blower Door Test (Air Leakage)

    Approved

    InspectorScot Jandro

    1.39 ACH
  5. Aug 12, 2025

    Final-NEW HOME

    Partial Approval

    InspectorScot Jandro

    -Provide draft stopping in mech room to achieve the 80 sf allowed -Provide information for the attic access in garage to be rated -Provide final as-built survey -Obtain approvals from engineering, planning, and forestry -Install driveway, sidewalks, lower level landing, sod and landscaping.
  6. Aug 12, 2025

    Bldg Progress

    Progress Report

    InspectorScot Jandro

    TCO letter sent
  7. Jul 29, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  8. Jul 3, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  9. Jun 18, 2025

    Erosion Ctrl/Const Entrance

    Approved, w/ Comments

    InspectorLindsay Evans

    Seasonal Inspections: IP has been reinstalled in CB in front of site. Overall, everything looked good.
  10. May 19, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  11. May 2, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  12. Apr 15, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  13. Mar 25, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  14. Feb 28, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  15. Feb 18, 2025

    Floor Slab

    Approved

    InspectorGodwin Annin

  16. Feb 18, 2025

    Framing-New Home

    Approved

    InspectorGodwin Annin

    inspected gyp board panels on main level and basement.
  17. Feb 13, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  18. Feb 7, 2025

    Insulation

    Approved

    InspectorPeter Akmenkalns

  19. Jan 30, 2025

    Foundation Pre-backfil (Top of foundation survey)

    Approved

    InspectorScot Jandro

    TOF survey saved to Lots survey and PIMS. See Administrative Exception in PDOX for FFE to be 882.2000 or in PIMS
  20. Jan 30, 2025

    Framing-New Home

    Not Approved

    InspectorBrian Crask

    -OK to insulate -Contractor planning to get interior braced wall panels inspected after insulation
  21. Jan 30, 2025

    Bldg Progress

    Progress Report

    InspectorBrian Crask

    -Need to submit revised plans for the window well.
  22. Jan 28, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorBrian Crask

    Erosion Ctrl appears to have been maintained and is in good condition.
  23. Jan 28, 2025

    Framing-New Home

    Partial Approval

    InspectorBrian Crask

    -OK to insulate -Contractor planning to get interior braced wall panels inspected after insulation -The as-built TOF survey is currently under review. -Need to submit revised plans for the window well.
  24. Jan 23, 2025

    Weather Barrier/Flashing

    Approved

    InspectorBrian Crask

  25. Jan 23, 2025

    Framing-New Home

    Not Approved

    InspectorBrian Crask

    -Need revised plan for change to egress well -Need foundation Pre-backfill TOF Survey Inspected. -Need to verify that electrical rough-in inspection passed. -EV Valley Truss missing lateral 1 brace -Missing 7th bearing stud at back left room on the lower level -Braced walls not ready for inspection.
Show 25 earlier inspections
  1. Jan 21, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  2. Jan 3, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  3. Dec 31, 2024

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Need to clean street and all along the curbline Replace damaged/flattened bio logs along the front property line
  4. Dec 4, 2024

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

    Fall/Winter Redevelopment Inspection *Inspected by John Brennan
  5. Dec 2, 2024

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Fall/Winter Redevelopment Inspection *Inspected by John Brennan - Fix gap in the silt fence on the south side of the property - Recommend moving the house sign out of the city ROW
  6. Nov 21, 2024

    Floor Slab

    Approved

    InspectorGodwin Annin

  7. Nov 19, 2024

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  8. Nov 15, 2024

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Clean sediment from street. Need to install proper rock entrance - veh's driving on/off in location of old driveway but its been removed
  9. Nov 7, 2024

    Residential Redevelopment Coordinator

    No Physical Inspection Done

    InspectorLindsay Evans

    Received complaint of a delivery at site at 5:30am this morning. Sent contractor an email to reiterate the allowed hours and to pass along to the sub-contractors.
  10. Oct 31, 2024

    Footing

    Not Approved, Not Home

    InspectorScot Jandro

    Deck footings, no one on site, no plans See note from Brian C.
  11. Oct 29, 2024

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  12. Oct 29, 2024

    Footing

    Not Approved

    InspectorBrian Crask

    -This is a partial inspection for deck footings only -Need an evaluation from a soils engineer due to the presence of organic material in the soils at the base of the footings for the deck.
  13. Oct 8, 2024

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  14. Oct 3, 2024

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  15. Oct 3, 2024

    Foundation Pre-Backfil

    Partial Approval

    InspectorPeter Akmenkalns

    insualtion draintile and water proofing ok need as built
  16. Sep 25, 2024

    Construction Fence

    Approved

    InspectorLindsay Evans

  17. Sep 25, 2024

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  18. Sep 24, 2024

    Poured Foundation Reinforcement

    Approved

    InspectorGodwin Annin

  19. Sep 11, 2024

    Footing

    Partial Approval

    InspectorGodwin Annin

    - Footing inspection for house only - No Egress well footing done, Contractor mentioned of a new Egress well design to be revised. - deck footing not ready,
  20. Sep 3, 2024

    Construction Fence

    Approved

    InspectorLindsay Evans

  21. Sep 3, 2024

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  22. Aug 26, 2024

    Construction Fence

    Approved, w/ Comments

    InspectorLindsay Evans

    Fence along same area. Looks good and all that is needed at this time.
  23. Aug 26, 2024

    Erosion Ctrl/Const Entrance

    Progress Report

    InspectorLindsay Evans

    IP device has been updated to orange bag w/bumper. Street has been cleaned. *Contractor said new rock will be installed when excavation crew comes to start the foundation.
  24. Aug 16, 2024

    Construction Fence

    Approved, w/ Comments

    InspectorLindsay Evans

    Safety fence has been installed along a section of the front where there is the only steep slope. No other areas are steep at this time (have not started excavating yet)
  25. Aug 16, 2024

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    House has been demo'd -Need to install new IP device. Current type is causing drainage issues and has been torn back to allow water flow into CB. -Existing driveway has been removed. Need to install a rock entrance -Clean up all sediment on the driveway apron and street along the curb

Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.