#ED215094Building
7019 Mccauley Tr S, Edina
IssuedOct 18, 2024
StatusUnknown
Value$125,000
Inspections7
Scope of work
Alteration/Remodel, Fire damage and replace (side 2)
Location context
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$62.5
Total paid$62.5
Timeline
ApprovedOct 4, 2024
IssuedOct 18, 2024
Inspection record
Inspections7
Passed5
Failed0
- Feb 18, 2025
Final (includes smoke and CO alarms)
ApprovedInspectorGodwin Annin
- Jan 30, 2025
Final (includes smoke and CO alarms)
Partial ApprovalInspectorGodwin Annin
Bathroom window required to be tempered.
- Nov 6, 2024
Insulation
ApprovedInspectorGodwin Annin
- Oct 31, 2024
Framing
ApprovedInspectorScot Jandro
Framing structure approved via engineers letter.
- Oct 31, 2024
Insulation
Not ApprovedInspectorScot Jandro
Seal all exposed joints in lumber for proper vapor barrier. Insulate rims at front of house and garage areas seal all top and bottom plate penetrations both levels.
- Oct 31, 2024
Bldg Progress
Progress ReportInspectorScot Jandro
Deck ledger is a non treated LVL, does not meet code for exterior construction lumber. Mentioned to contractor to replace
- Aug 8, 2024
Bldg Progress
Progress ReportInspectorScot Jandro
No Permit for this side at this time. Interior of house is gutted, trusses have been altered with webs replaced, sub floor partially replaced, upper level beams installed, some roof deck ing replaced, ledger boards removed, common wall is CMU. Engineering required for altered trusses, LVL beam, and existing steel beams in basement that are warped.