Building
4311 Eton Pl, Edina
New, NEW HOME: Escrow Paid
- Jul 1, 2025
Escrow
Approved, w/ CommentsInspectorLindsay Evans
OK to issue escrow refund.
- Jul 1, 2025
Building Final
Approved, w/ CommentsInspectorNate Borwege
Escrow refund of $10,000 Approved.
- Jun 30, 2025
Escrow
Progress ReportInspectorLindsay Evans
Both open permits have been addressed. OK to proceed with escrow refund
- Jun 20, 2025
Escrow
Progress ReportInspectorLindsay Evans
There are still 2 permits that have not been resolved/closed yet.
- Jun 18, 2025
Escrow
Progress ReportInspectorLindsay Evans
Conducted Final New Home inspection - took photos and uploaded to PDox. Overall site looked good. IP has been removed. Per Water Resources: Well sealing record received (H413668).
- Jun 16, 2025
Escrow
Progress ReportInspectorLindsay Evans
Received online escrow refund request. Working to process.
- Jun 9, 2025
Planning
ApprovedInspectorKris Aaker
- Jun 9, 2025
Tree Final (call 952-826-0308)
ApprovedInspectorLaura Beres
- Jun 9, 2025
Final-NEW HOME
ApprovedInspectorScot Jandro
C of O sent
- Jun 9, 2025
Residential Redevelopment Coordinator
ApprovedInspectorLindsay Evans
- Jun 2, 2025
Engineering (call 952-903-5728)
ApprovedInspectorAndy Reinisch
- Jun 2, 2025
Blower Door Test (Air Leakage)
ApprovedInspectorScot Jandro
ACH 2.34
- Jun 2, 2025
Final-NEW HOME
Partial ApprovalInspectorScot Jandro
-Provide As-Built survey -Obtain approvals from Planning, engineering and forestry
- Jun 2, 2025
Final As Built Survey
Progress ReportInspectorScot Jandro
Existing 912.6000 as-built 910.8000, Proposed 910.6800
- Jun 2, 2025
Temporary CO
Temp. Occupancy ApprovedInspectorErin Rust
Temp CO Issued (ED222226) on 6/2/25.
- May 30, 2025
Final-NEW HOME
Not ApprovedInspectorScot Jandro
-Provide electrical final inspection -seal attic access -provide draft stop for 80sf mech room -Seal sewer line at concrete wall -Install sod/landscape -Fix egress ladder rung Provide As-Built survey -Obtain approvals from Planning, engineering and forestry
- May 29, 2025
Erosion Ctrl/Const Entrance
Approved, w/ CommentsInspectorLindsay Evans
Looks like site prepping for landscape and sod
- May 12, 2025
Erosion Ctrl/Const Entrance
Approved, w/ CommentsInspectorLindsay Evans
Spring Inspection OK
- Apr 29, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Apr 17, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Mar 31, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Mar 18, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Mar 3, 2025
Engineering (call 952-903-5728)
Progress ReportInspectorAndy Reinisch
Sidewalk panel still missing from gas hook up. Coordinating temp replacement with CenterPoint.
- Feb 28, 2025
Erosion Ctrl/Const Entrance
Approved, w/ CommentsInspectorAndy Reinisch
All items from 2/25/25 resolved except sidewalk panel replacement.
- Feb 28, 2025
Engineering (call 952-903-5728)
Progress ReportInspectorAndy Reinisch
Sidewalk panel should be reinstalled from CenterPoint
Show 38 earlier inspections
- Feb 25, 2025
Erosion Ctrl/Const Entrance
Progress ReportInspectorAndy Reinisch
- All sand and dirt needs to be removed from the sidewalk for a clear pedestrian path of travel. - Sidewalk panel that was removed needs to be repaired with either temporary asphalt or a permanent concrete. This cannot remain as sand. - Wrap permitter control bio logs around boulevard in areas that have been disturbed or driven on. Sediment appears to be making its way to the neighbor’s property and street. - Clean up all garbage and debris along the outside. - These items need to be addressed by noon on Friday, February 28th. I will conduct a follow up inspection Friday afternoon.
- Feb 11, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Jan 30, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Jan 17, 2025
Insulation
ApprovedInspectorGodwin Annin
- Jan 16, 2025
Framing-New Home
ApprovedInspectorBrian Crask
- Jan 13, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Jan 10, 2025
Framing-New Home
Not ApprovedInspectorBrian Crask
-Need Plumbing RI inspection approved. -Need Electrical rough-in inspection -Need a permit for the fireplace and a rough-in inspection. -Braced walls sections at rear wall need truss heal blocking at back right of the house (left side of window).
- Jan 3, 2025
Framing-New Home
Not ApprovedInspectorBrian Crask
-Need Plumbing RI inspection approved. -Need Electrical rough-in inspection -Braced walls sections at rear wall need truss heal blocking. -Need truss specs on-site for review. -Need to review if all 3 ply stud under beams are per plan.
- Dec 27, 2024
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Dec 27, 2024
Construction Fence
Approved, w/ CommentsInspectorLindsay Evans
Safety fence no longer needed
- Dec 19, 2024
Weather Barrier/Flashing
ApprovedInspectorGodwin Annin
- Dec 16, 2024
Residential Redevelopment Coordinator
No Physical Inspection DoneInspectorLindsay Evans
Received complaint that crews were working by 7:30am on Saturday 12/14/24; allowed hours don't start until 9am on Saturdays.
- Dec 6, 2024
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
Fall/Winter Redevelopment Inspection *Inspected by John Brennan
- Dec 2, 2024
Erosion Ctrl/Const Entrance
Not ApprovedInspectorLindsay Evans
Fall/Winter Redevelopment Inspection *Inspected by John Brennan (met with builder) - Fix silt fence section in the backyard - Move materials and portable bathroom outside the city ROW
- Nov 25, 2024
Foundation Pre-backfil (Top of foundation survey)
ApprovedInspectorBrian Crask
- Nov 25, 2024
Floor Slab
ApprovedInspectorBrian Crask
- Nov 22, 2024
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Nov 22, 2024
Construction Fence
ApprovedInspectorLindsay Evans
- Nov 19, 2024
Construction Fence
ApprovedInspectorLindsay Evans
- Nov 19, 2024
Erosion Ctrl/Const Entrance
Not ApprovedInspectorLindsay Evans
-Site sign was down -Need to install rock entrance -Need to thoroughly clean street
- Nov 18, 2024
Foundation Pre-Backfil
ApprovedInspectorBrian Crask
- Nov 18, 2024
Construction Fence
ApprovedInspectorBrian Crask
- Nov 18, 2024
Erosion Ctrl/Const Entrance
ApprovedInspectorBrian Crask
- Nov 14, 2024
Bldg Progress
No Inspection RequiredInspectorLindsay Evans
Contractor sent me TOF survey. I fwd to Brian as he was last inspector.
- Nov 14, 2024
Foundation Pre-backfil (Top of foundation survey)
Partial ApprovalInspectorBrian Crask
TOF survey is approved pending "Foundation Pre-backfill" Field inspection.
- Nov 12, 2024
Poured Foundation Reinforcement
ApprovedInspectorBrian Crask
- Nov 12, 2024
Erosion Ctrl/Const Entrance
ApprovedInspectorBrian Crask
- Nov 12, 2024
Construction Fence
ApprovedInspectorBrian Crask
- Nov 8, 2024
Construction Fence
ApprovedInspectorLindsay Evans
- Nov 8, 2024
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Nov 6, 2024
Shoring needs to be done before footing inspection
ApprovedInspectorScot Jandro
- Nov 6, 2024
Footing
ApprovedInspectorScot Jandro
- Nov 6, 2024
Erosion Ctrl/Const Entrance
ApprovedInspectorScot Jandro
- Nov 1, 2024
Construction Fence
ApprovedInspectorLindsay Evans
- Nov 1, 2024
Erosion Ctrl/Const Entrance
Approved, w/ CommentsInspectorLindsay Evans
Looks good, just make sure to clean street at end of day.
- Oct 30, 2024
Residential Redevelopment Coordinator
No Physical Inspection DoneInspectorLindsay Evans
Received email from contractor w/attachment of well sealing record (H413668). I removed the Hold in PIMS and fwd the email and documentation to Engineering for their files.
- Oct 29, 2024
Erosion Ctrl/Const Entrance
Progress ReportInspectorLindsay Evans
Working on well sealing today. Contractor will send the record/documentation when completed.
- Oct 11, 2024
Tree Plan
Approved, w/ CommentsInspectorLindsay Evans
See tree escrow permit - NRMP ED216234: preserving 2 trees, remove 1 ( 3 ash removed in 2023). LB
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.