PULLFIRST[THE RECORD]
Permit / Edina← Search
#ED215168

Building

4601 Concord Ter, Edina

IssuedNov 12, 2024
StatusUnknown
Value$750,000
Inspections72
Scope of work

New, New Home with deck

Location context
Parcel1902824240015
Coordinates44.89891, -93.34180
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$3,125
Total paid$3,125
Timeline
ApprovedNov 8, 2024
IssuedNov 12, 2024
Inspection record
Inspections72
Passed63
Failed0
  1. Mar 20, 2026

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  2. Feb 9, 2026

    Final-NEW HOME

    Not Approved

    InspectorBrian Crask

    -Need handrail at porch stairs and at garage to house stairs -Bolt egress ladder to the well -Submit Energy Efficiency certificate -Need final approvals for Demo Permit: ED215798 -Need final approvals from Engineering and Residential Redevelopment. Note: Residential Redevelopment final inspection will take place after the snow melts.
  3. Feb 6, 2026

    Residential Redevelopment Coordinator

    Progress Report

    InspectorLindsay Evans

    RRC final inspection will need to wait until all the snow has melted.
  4. Feb 2, 2026

    Tree Final (call 952-826-0308)

    Approved

    InspectorLaura Beres

    Planted 16 new trees. LB
  5. Jan 30, 2026

    Planning

    Approved

    InspectorKris Aaker

  6. Jan 29, 2026

    Final As Built Survey

    Progress Report

    InspectorBrian Crask

    A revised final as-built grade & FFE survey has been submitted, saved to PIMs & Lot Photos, and sent to Planning, Engineering, Forestry, and Residential Redevelopment for final reviews. Note: The revised FFE on the new survey is within the allowable limit.
  7. Jan 27, 2026

    Foundation Pre-backfil (Top of foundation survey)

    Not Approved

    InspectorGodwin Annin

    - Top of Foundation is 887.71 ( which is higher than required) - Proposed survey was 887.67
  8. Jan 27, 2026

    Final-NEW HOME

    Not Approved

    InspectorBrian Crask

    -Foundation Pre-Backfill Top of Foundation Survey inspection has been entered as Not Approved due to being too high. -The Final As-Built grade & FFE was submitted and is .09' too high. See Final As-built Survey inspection result for details. -Need handrail at porch stairs and at garage to house stairs -Bolt egress ladder to the well -Submit Energy Efficiency certificate -Need final approvals for Demo Permit: ED215798 -Need final approvals from Planning, Engineering, Forestry, and Residential Redevelopment.
  9. Jan 21, 2026

    Final As Built Survey

    Not Approved

    InspectorBrian Crask

    -The as-built FFE is 889.95 and the max allowed is 889.86, so it is .09 too high. This exceeds the 1 food max allowable increase in the FFE. -The final as-built grade and FFE survey has been submitted, saved to PIMs Photos and Lot Surveys, and sent to Planning, Engineering, Forestry, and Residential Redevelopment for final reviews.
  10. Jan 21, 2026

    Blower Door Test (Air Leakage)

    Approved

    InspectorBrian Crask

    Blower Door Test passed at 1.5 ACH
  11. Jan 20, 2026

    Final-NEW HOME

    Not Approved

    InspectorBrian Crask

    -Foundation Pre-Backfill Top of Foundation Survey never submitted. Need this inspection completed. -Need handrail at porch stairs and at garage to house stairs -Bolt egress ladder to the well -Submit blower door test -Submit As-Built survey -Submit Energy Efficiency certificate -Need final inspections for all related permits -Need final approvals from Planning, Engineering, Forestry, and Residential Redevelopment.
  12. Dec 1, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorAndy Reinisch

  13. Nov 25, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorAndy Reinisch

    IP has not been removed Decuct $150
  14. Nov 24, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorAndy Reinisch

    IP has not been removed Decuct $150
  15. Nov 20, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorAndy Reinisch

    Site is mostly done and restored. Inlet protection needs to be removed.
  16. Sep 15, 2025

    Erosion Ctrl/Const Entrance

    Approved, w/ Comments

    InspectorLindsay Evans

    Has been cleaned around CB & IP device
  17. Sep 12, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Site sign had been nailed to a tree. Area around CB has not been cleaned Deduct $150
  18. Sep 5, 2025

    Tree Protection (call 952-826-0308)

    Progress Report

    InspectorLindsay Evans

    All tree protection still down. Notified Luther/Laura to address.
  19. Sep 5, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Site sign needs to be reinstalled Need to clean out IP device and around the CB Other EC-BMP's around perimeter of site looked ok. Not much further with landscape than in mid-July (have installed boulders along West property line)
  20. Aug 20, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  21. Aug 1, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  22. Jul 18, 2025

    Erosion Ctrl/Const Entrance

    Progress Report

    InspectorLindsay Evans

    Overall site looked good (same as insp on 7/16/25) *No tree protection up
  23. Jul 16, 2025

    Erosion Ctrl/Const Entrance

    Progress Report

    InspectorLindsay Evans

    Inspected by Andy - all items discussed have been addressed and installed as of today. Need to continually maintain and keep street clean.
  24. Jul 15, 2025

    Tree Protection (call 952-826-0308)

    Progress Report

    InspectorLindsay Evans

    All tree protection was still down. Contractor indicated needed to be in order to do landscape and no longer driving on-site. Notified Forestry to address if they have concerns.
  25. Jul 15, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Meet contractor on-site to discuss ongoing EC and overall site concerns: - Need to install EC along South property line - Need to properly install all other EC BMP's - Need to clean street and keep clean
Show 47 earlier inspections
  1. Jul 14, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Same variation of EC concerns are indicated previously.
  2. Jul 11, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    *Dumpster has been emptied. - CB has been cleaned out but still significant clean up to do around it as well as along the curbline for the entire length of the site (both sides and curve). - Silt fence re-installed where missing/damaged next to the driveway, however, multiple areas are still not properly trenched. - EC BMP's still missing along entire south side of lot
  3. Jul 11, 2025

    Tree Protection (call 952-826-0308)

    Not Approved

    InspectorLindsay Evans

    No change
  4. Jul 10, 2025

    Tree Protection (call 952-826-0308)

    Not Approved

    InspectorLindsay Evans

    No change
  5. Jul 10, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Majority of items still not addressed
  6. Jul 9, 2025

    Tree Protection (call 952-826-0308)

    Not Approved

    InspectorLindsay Evans

    Tree protection was removed from almost all trees on-site and needs to be reinstalled. Required to remain installed until all landscape and sod complete.
  7. Jul 9, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Previous items noted from inspection on 7/3/25 not addressed. In addition, the following needs to be corrected: - Reestablish EC along the front of site to the left of the driveway (subs on-site actively working today were entering/exiting in this area creating track out and damaged the EC BMP's) - Clean sediment from street
  8. Jul 3, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Correction needed on the following still: - Clean up sediment that's accumulation along curb line - Clean out IP device and around entire CB - Dumpster needs to be emptied - Silt fence needs to be trenched *Both Andy and I re-inspected this site today.
  9. Jul 1, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    • Silt fence on south side is still not installed properly and is causing an increase in drainage to the neighbors to the south. • There are gaps in perimeter control along the street and sediment is overflowing into the curb line. • Sediment has been tracked out into the road going south. Please clean the street of any sediment and debris in the street caused by construction at the end of each working day. • The site has a fair amount of trash that should be cleaned up to prevent wind from blowing it into private property or the street. • The sump discharge in the rear yard is connected to a pipe and outletting to the neighbors to the south. Sump discharges are not allowed to drain to private property and needs to be directed towards the street as intended in the final plan. *Inspected by Andy
  10. Jun 20, 2025

    Framing-New Home

    Approved

    InspectorScot Jandro

  11. Jun 20, 2025

    Insulation

    Approved

    InspectorScot Jandro

  12. Jun 12, 2025

    Framing-New Home

    Not Approved

    InspectorScot Jandro

    -2x achor bolts missing at garage plate splices -Positive connection at front porch post and beam -missing nails at truss hanger at girder above stairs -add nails to 2x4 along truss -add nails to porch beam pocket at stairs
  13. Jun 12, 2025

    Weather Barrier/Flashing

    Approved

    InspectorScot Jandro

  14. May 27, 2025

    Tree Protection (call 952-826-0308)

    Approved

    InspectorLindsay Evans

  15. May 27, 2025

    Erosion Ctrl/Const Entrance

    Progress Report

    InspectorLindsay Evans

    Inspected by Andy: -curb line cleaned, IP installed, verified rock entrance replenished New silt fence installed, however, improperly and not trenched. NEED TO CORRECT
  16. May 22, 2025

    Erosion Ctrl/Const Entrance

    Progress Report

    InspectorLindsay Evans

    Rock entrance has been replenished *All other items still outstanding from inspection on 5/21/25
  17. May 21, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorAndy Reinisch

    • There is no perimeter control along the southeast corner of the site near the stockpile. Your erosion control plan indicates perimeter control along the property line and additional double row of bio logs around the stockpile. • The curb lines need to have perimeter control re-established. There are several gaps and sediment is getting into the curb line. • Several spots along the existing bio logs and silt fence are failing and need to be reinstalled. (multiple bio logs ripped open, silt fence has been torn down). • The curb line needs to be cleaned of sediment all the way to the catch basin at the intersection of St. Johns Ave and 58th st. • The storm sewer inlet at St. Johns Ave and 58th street needs inlet protection. • The silt fence along the rear property line has failed and needs to be reinstalled to prevent sediment from draining onto private property. • Need to install/replenish rock entrance. Refer to your Erosion and Sediment control plan for specifications. • Need to reinstall all tree fencing around protected trees.
  18. May 21, 2025

    Tree Protection (call 952-826-0308)

    Not Approved

    InspectorLindsay Evans

    All tree fencing was down
  19. May 15, 2025

    Tree Protection (call 952-826-0308)

    Not Approved

    InspectorLindsay Evans

    All tree fencing down
  20. May 15, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Spring Inspection: - Need to install double row of bio logs around stockpile - EC has been removed along various parts of perimeter and needs to be reinstalled - Need to thoroughly clean entire width of street entire length of site - Replenish rock in entrance - Replace all damaged/ineffective bio logs
  21. May 15, 2025

    Floor Slab

    Approved

    InspectorTedd Nelson

    - Basement vapor barrier and 2" polystyrene installed
  22. Apr 17, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  23. Mar 31, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  24. Mar 18, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  25. Feb 27, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  26. Feb 13, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  27. Feb 7, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Section in the curve where veh's driving on/off site - need to install proper rock entrance or discontinue using this area. Clean up all sediment that has tracked out into the street.
  28. Jan 30, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  29. Jan 13, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  30. Dec 27, 2024

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  31. Dec 16, 2024

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  32. Dec 13, 2024

    Tree Protection (call 952-826-0308)

    Approved

    InspectorLuther Overholt

    Tree fencing up.
  33. Dec 12, 2024

    Footing

    Approved

    InspectorPeter Akmenkalns

    5 deck footings
  34. Dec 10, 2024

    Tree Protection (call 952-826-0308)

    Not Approved

    InspectorLuther Overholt

    Tree fencing down on multiple trees onsite still.
  35. Dec 9, 2024

    Footing

    Not Approved, Not Ready

    InspectorBrian Crask

    This inspection is limited to the pier footings at the left side of the house. These pier footings are not ready for inspection at this time. Contractor on-site is planning to reschedule.
  36. Dec 9, 2024

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Deduct $150 - Fall/Winter Redevelopment Inspection *Inspected by John Brennan - Need to have an erosion control measure along all of the curb - Street still needs to be cleaned
  37. Dec 3, 2024

    Foundation Pre-backfil (Top of foundation survey)

    Not Approved

    InspectorGodwin Annin

    Pending TOF Survey from Contractor
  38. Dec 3, 2024

    Foundation Pre-Backfil

    Approved

    InspectorGodwin Annin

  39. Dec 3, 2024

    Construction Fence

    Approved

    InspectorLindsay Evans

  40. Dec 3, 2024

    Erosion Ctrl/Const Entrance

    Progress Report

    InspectorLindsay Evans

    Fall/Winter Redevelopment Inspection *Inspected by John Brennan - Couldn't see street quality due to snow. Will check again Friday 12/6/24 - Extension granted to fix erosion control as they plan backfilling on Friday 12/6/24 - Important items were addressed
  41. Nov 25, 2024

    Construction Fence

    Not Approved

    InspectorLindsay Evans

    Needs to be installed
  42. Nov 25, 2024

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Fall/Winter Redevelopment Inspection *Inspected by John Brennan - Construction fence is required from demo until the new house foundation no longer is exposed as an open pit - Add silt fence section to front yard as shown in photo to builder - Add bio log or stabilize section where trucks parked on lawn - Replace the silt fence along the driveway and add either silt fence or bio log on the side of the driveway - Sweep road until the intersection as silt has been washed away down to the intersection of St. Johns Ave & 58th St W - Add some sort of protection under bush on south side of property or move stockpile back and fix the broken silt fence section (photo to builder)
  43. Nov 19, 2024

    Poured Foundation Reinforcement

    Approved

    InspectorGodwin Annin

  44. Nov 18, 2024

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Lots of clean up to do on the street along both sides of site all the way to the intersection. Discontinue driving on areas w/o proper rock entrance.
  45. Nov 18, 2024

    Tree Protection (call 952-826-0308)

    Not Approved

    InspectorLindsay Evans

    Put tree fence back up and stop driving in critical root area
  46. Nov 13, 2024

    Shoring needs to be done before footing inspection

    Approved

    InspectorPeter Akmenkalns

    10 feet from property line
  47. Nov 13, 2024

    Footing

    Partial Approval

    InspectorPeter Akmenkalns

    house and garage footings approved deck not ready

Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.