Building
5115 Lake Ridge Rd, Edina
Other Demolition (645-649), DEMO HOME/MOVE - escrow paid
- Aug 20, 2025
Escrow
Approved, w/ CommentsInspectorLindsay Evans
OK to issue escrow refund. Per Water Resources: If not in use, the existing well will need to be located, sealed, and documented with the city prior to new home permit approval.
- Aug 20, 2025
Building Final
Approved, w/ CommentsInspectorNate Borwege
Escrow refund of $2500 Approved.
- Aug 19, 2025
Escrow
Progress ReportInspectorLindsay Evans
Sent contractor an email with the link for escrow refund.
- Aug 4, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Jul 11, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Jul 9, 2025
Erosion Ctrl/Const Entrance
Progress ReportInspectorLindsay Evans
Clean up street around entrance area
- Jun 20, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Jun 20, 2025
Construction Fence
ApprovedInspectorLindsay Evans
- Jun 6, 2025
Erosion Ctrl/Const Entrance
Approved, w/ CommentsInspectorLindsay Evans
Contractor got back to me and said they were doing that to not damage the street due to the equipment they were driving on/off the site
- Jun 5, 2025
Construction Fence
Progress ReportInspectorLindsay Evans
Partial fence up. Need to install around remaining area to fully enclose excavated area with steep slopes
- Jun 5, 2025
Erosion Ctrl/Const Entrance
Progress ReportInspectorLindsay Evans
Lots of sand in street (looks intentional so reached out to contractor as to why)
- May 30, 2025
Erosion Ctrl/Const Entrance
Approved, w/ CommentsInspectorAndy Reinisch
Spring Inspection - site looked good
- May 13, 2025
Demo Final
Approved, w/ CommentsInspectorLindsay Evans
No inspection conducted for Demo Final so using the Approved Footing inspection that Peter did on New Home permit #ED219420 on 5/13/25
- May 12, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- May 12, 2025
Construction Fence
ApprovedInspectorLindsay Evans
- May 5, 2025
Residential Redevelopment Coordinator
No Physical Inspection DoneInspectorLindsay Evans
Contractor emailed the well sealing record H406542. I saved to PDox and also forwarded to Engineering.
- Apr 29, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Apr 25, 2025
Residential Redevelopment Coordinator
No Physical Inspection DoneInspectorLindsay Evans
- Feb 7, 2025
Tree Plan
Approved, w/ CommentsInspectorLindsay Evans
See tree escrow permit # ED218321 - Remove 9 trees, preserve 16. 88.5'/11.25" replacements, escrow $32,917.50. Tree fencing approved. LB
- Feb 4, 2025
Preconstruction
Approved, w/ CommentsInspectorLindsay Evans
Received pic from contractor showing that the gas has been disconnected and meter removed.
- Jan 24, 2025
Preconstruction
Not ApprovedInspectorLindsay Evans
*GAS service has NOT been disconnected. Electric ok/removed. Overall site looked good. EC in place (bio logs, extended around entire perimeter of both lots). Site sign up. Using existing driveway until no longer sufficient as construction entrance/exit. No IP (weather). Pre demo photos uploaded in PDox. Per Water Resources: If not in use, the existing well will need to be located, sealed, and documented with the city prior to new home permit approval.
- Jan 24, 2025
Tree Protection (call 952-826-0308)
Progress ReportInspectorLindsay Evans
No tree protection had been installed by the time pre-demo inspection conducted.
- Jan 14, 2025
Bldg Progress
No Inspection RequiredInspectorLindsay Evans
Site Restoration plan submitted during permit review since there isn't a New Home application in place. Therefore, you are required to stabilize the site immediately following the demo and required to have the following inspections upon completion (prior to receiving the escrow refund): - Inspection of hole after removal of all debris PRIOR TO FILLING (Building Inspections, 952-826-0372) - Demo Final after leveling soils w/NO steep slopes (Building Inspections, 952-826-0372) - Engineering Final after Site Stabilization on all disturbed soils (Engineering Dept. 952-903-5728) - Tree Final (Forestry Dept. 952-826-0308)
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.