PULLFIRST[THE RECORD]
Permit / Edina← Search
#ED218215

Building

5115 Lake Ridge Rd, Edina

IssuedMar 24, 2025
StatusUnknown
Value$50,000
Inspections23
Scope of work

Other Demolition (645-649), DEMO HOME/MOVE - escrow paid

Location context
Parcel2911721320011
Coordinates44.91080, -93.37985
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$250
Total paid$250
Timeline
ApprovedFeb 7, 2025
IssuedMar 24, 2025
Inspection record
Inspections23
Passed15
Failed0
  1. Aug 20, 2025

    Escrow

    Approved, w/ Comments

    InspectorLindsay Evans

    OK to issue escrow refund. Per Water Resources: If not in use, the existing well will need to be located, sealed, and documented with the city prior to new home permit approval.
  2. Aug 20, 2025

    Building Final

    Approved, w/ Comments

    InspectorNate Borwege

    Escrow refund of $2500 Approved.
  3. Aug 19, 2025

    Escrow

    Progress Report

    InspectorLindsay Evans

    Sent contractor an email with the link for escrow refund.
  4. Aug 4, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  5. Jul 11, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  6. Jul 9, 2025

    Erosion Ctrl/Const Entrance

    Progress Report

    InspectorLindsay Evans

    Clean up street around entrance area
  7. Jun 20, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  8. Jun 20, 2025

    Construction Fence

    Approved

    InspectorLindsay Evans

  9. Jun 6, 2025

    Erosion Ctrl/Const Entrance

    Approved, w/ Comments

    InspectorLindsay Evans

    Contractor got back to me and said they were doing that to not damage the street due to the equipment they were driving on/off the site
  10. Jun 5, 2025

    Construction Fence

    Progress Report

    InspectorLindsay Evans

    Partial fence up. Need to install around remaining area to fully enclose excavated area with steep slopes
  11. Jun 5, 2025

    Erosion Ctrl/Const Entrance

    Progress Report

    InspectorLindsay Evans

    Lots of sand in street (looks intentional so reached out to contractor as to why)
  12. May 30, 2025

    Erosion Ctrl/Const Entrance

    Approved, w/ Comments

    InspectorAndy Reinisch

    Spring Inspection - site looked good
  13. May 13, 2025

    Demo Final

    Approved, w/ Comments

    InspectorLindsay Evans

    No inspection conducted for Demo Final so using the Approved Footing inspection that Peter did on New Home permit #ED219420 on 5/13/25
  14. May 12, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  15. May 12, 2025

    Construction Fence

    Approved

    InspectorLindsay Evans

  16. May 5, 2025

    Residential Redevelopment Coordinator

    No Physical Inspection Done

    InspectorLindsay Evans

    Contractor emailed the well sealing record H406542. I saved to PDox and also forwarded to Engineering.
  17. Apr 29, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  18. Apr 25, 2025

    Residential Redevelopment Coordinator

    No Physical Inspection Done

    InspectorLindsay Evans

  19. Feb 7, 2025

    Tree Plan

    Approved, w/ Comments

    InspectorLindsay Evans

    See tree escrow permit # ED218321 - Remove 9 trees, preserve 16. 88.5'/11.25" replacements, escrow $32,917.50. Tree fencing approved. LB
  20. Feb 4, 2025

    Preconstruction

    Approved, w/ Comments

    InspectorLindsay Evans

    Received pic from contractor showing that the gas has been disconnected and meter removed.
  21. Jan 24, 2025

    Preconstruction

    Not Approved

    InspectorLindsay Evans

    *GAS service has NOT been disconnected. Electric ok/removed. Overall site looked good. EC in place (bio logs, extended around entire perimeter of both lots). Site sign up. Using existing driveway until no longer sufficient as construction entrance/exit. No IP (weather). Pre demo photos uploaded in PDox. Per Water Resources: If not in use, the existing well will need to be located, sealed, and documented with the city prior to new home permit approval.
  22. Jan 24, 2025

    Tree Protection (call 952-826-0308)

    Progress Report

    InspectorLindsay Evans

    No tree protection had been installed by the time pre-demo inspection conducted.
  23. Jan 14, 2025

    Bldg Progress

    No Inspection Required

    InspectorLindsay Evans

    Site Restoration plan submitted during permit review since there isn't a New Home application in place. Therefore, you are required to stabilize the site immediately following the demo and required to have the following inspections upon completion (prior to receiving the escrow refund): - Inspection of hole after removal of all debris PRIOR TO FILLING (Building Inspections, 952-826-0372) - Demo Final after leveling soils w/NO steep slopes (Building Inspections, 952-826-0372) - Engineering Final after Site Stabilization on all disturbed soils (Engineering Dept. 952-903-5728) - Tree Final (Forestry Dept. 952-826-0308)