PULLFIRST[THE RECORD]
Permit / Edina← Search
#ED218855

Building

6136 Oaklawn Ave, Edina

IssuedMay 20, 2025
StatusUnknown
Value$650,000
Inspections39
Scope of work

New, NEW HOME

Location context
Parcel1902824430074
Coordinates44.89197, -93.33665
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$3,250
Total paid$3,250
Timeline
ApprovedMay 20, 2025
IssuedMay 20, 2025
Inspection record
Inspections39
Passed30
Failed0
  1. Feb 6, 2026

    Blower Door Test (Air Leakage)

    Approved

    InspectorBrian Crask

    Blower door test approved at 1.87 ACH
  2. Feb 6, 2026

    Final-NEW HOME

    Not Approved

    InspectorBrian Crask

    -Missing house numbers -Seal siding penetrations -Cut plumbing vent caps at roof -Tempered glass required within 5 feet of tub -Front bedroom needs window fall protection and tempered glass. -Post the energy efficiency certificate -Submit the final as-built Grade & FFE survey for review -Need final approvals from Planning, Engineering, Forestry, and Residential Redevelopment. -Need final approvals on all related permits.
  3. Dec 9, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  4. Nov 26, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

    Fall Inspection Site is OK (Inspected by Drew Hollister)
  5. Nov 21, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Fall Inspection Sweep street and ensure free of tracked material Re-install site sign to be visible (Inspected by Drew Hollister)
  6. Nov 7, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Need to replenish rock entrance Replace bio logs along front where flattened and/or damaged Clean street to be free of sediment trackout
  7. Oct 8, 2025

    Residential Redevelopment Coordinator

    Approved, w/ Comments

    InspectorLindsay Evans

    Verified trailer has been moved
  8. Oct 7, 2025

    Residential Redevelopment Coordinator

    Progress Report

    InspectorLindsay Evans

    Received complaint of trailer being parked on the street for the past couple weeks (overnight). Move onto site or remove at the end of each work day.
  9. Oct 2, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  10. Sep 15, 2025

    Weather Barrier/Flashing

    Approved

    InspectorBrian Crask

  11. Sep 15, 2025

    Framing-New Home

    Approved

    InspectorBrian Crask

  12. Sep 15, 2025

    Insulation

    Approved

    InspectorBrian Crask

    Note: Garage tuck is included.
  13. Sep 15, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  14. Sep 10, 2025

    Framing-New Home

    Not Approved

    InspectorBrian Crask

    -Missing full height stud at side of front left room -Missing header straps at garage PF -Need to verify that all truss heals have a 2x4 box, per plan.
  15. Sep 9, 2025

    Framing-New Home

    Not Approved

    InspectorBrian Crask

    -Missing top plate straps in front left room -Missing full height stud at side of front left room -Missing header straps at garage PF -Truss heal doesn't have a 2x4 box, per plan.
  16. Sep 9, 2025

    Weather Barrier/Flashing

    Progress Report

    InspectorBrian Crask

    WRB not ready for inspection at this time. Installation is only 70% completed.
  17. Aug 20, 2025

    Erosion Ctrl/Const Entrance

    Progress Report

    InspectorLindsay Evans

    Most items were corrected. -Still need to replenish rock entrance (contractor will send pic) -Clean up street near entrance and along curbline at end of day
  18. Aug 14, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Replenish rock entrance Clean up street Replace bio logs along curb and driveway entrance Replace missing sections of bio logs in various along left (south) side of site Install bio logs along the back (where old garage has been removed)
  19. Jul 29, 2025

    Floor Slab

    Approved

    InspectorBrian Crask

  20. Jul 29, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorBrian Crask

  21. Jul 24, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  22. Jul 18, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Replenish rock entrance Clean up sediment that has tracked out into the street
  23. Jul 7, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  24. Jul 1, 2025

    Construction Fence

    Approved, w/ Comments

    InspectorLindsay Evans

    No longer needed at this time
  25. Jul 1, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Bio logs near entrance are damaged and need to be replaced
Show 14 earlier inspections
  1. Jun 24, 2025

    Erosion Ctrl/Const Entrance

    Progress Report

    InspectorLindsay Evans

  2. Jun 23, 2025

    Foundation Pre-backfil (Top of foundation survey)

    Approved

    InspectorTedd Nelson

    - TOF As-built 900.07
  3. Jun 18, 2025

    Foundation Pre-Backfil

    Approved

    InspectorTedd Nelson

  4. Jun 18, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Replenish rock entrance Replace bio logs that are broken near entrance Clean up street where dirt and sediment has tracked out
  5. Jun 18, 2025

    Construction Fence

    Progress Report

    InspectorLindsay Evans

    Safety fence was up but entire front was open and no workers on-site. Needs to be closed when not actively working.
  6. Jun 13, 2025

    Poured Foundation Reinforcement

    Approved

    InspectorPeter Akmenkalns

  7. Jun 12, 2025

    Footing

    Approved

    InspectorPeter Akmenkalns

    Haugo soil report received for back fill of old basement
  8. Jun 9, 2025

    Construction Fence

    Approved

    InspectorLindsay Evans

  9. Jun 9, 2025

    Erosion Ctrl/Const Entrance

    Progress Report

    InspectorLindsay Evans

    Overall, the site looked good but need to replenish rock in entrance - I notified Al.
  10. Jun 5, 2025

    Erosion Ctrl/Const Entrance

    Progress Report

    InspectorLindsay Evans

    Met Al Richter on-site to discuss overall site conditions and expectations. Reiterated all items Andy noted on 6/4/25 and will follow up again tomorrow.
  11. Jun 5, 2025

    Construction Fence

    Progress Report

    InspectorLindsay Evans

    Showed exactly where safety fence needed to be installed by the end of the day (as there will be steep slopes and required at that point). Explained that it needs to remain installed until backfilled and 1st floor completed.
  12. Jun 4, 2025

    Erosion Ctrl/Const Entrance

    Progress Report

    InspectorLindsay Evans

    Andy conducted a follow up inspection. Improvement but still need some corrections. *Note: Rock entrance has been installed -Bio logs missing and damaged - need to replace -Sediment and rock spilling over curb into street w/no EC barrier - needs to get pulled back onto site and proper EC established -Significant sediment build up along the curbline - needs to get removed and swept -Majority of the street had been cleaned but there are still areas that need to be swept more
  13. Jun 3, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    No proper entrance - need to install rock entrance Sediment tracked out into the street (over a block in both directions) - needs to get cleaned up immediately Bio logs along the front and near entrance/exit no longer visible or functioning - need to replace all that are damaged and/or missing
  14. May 28, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorAndy Reinisch

    Spring 2025 Seasonal *Bio logs in place around perimeter *Existing driveway being used as entrance *Site sign is up *Demo has not begun yet.

Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.