#ED220251

Building

88 Woodland Cir, Edina

IssuedJun 5, 2025
StatusUnknown
Value$2,500,000
Inspections32
Scope of work

New, NEW HOME

Location context
Parcel1902824140026
Coordinates44.90045, -93.33123
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$12,500
Total paid$12,500
Timeline
ApprovedJun 3, 2025
IssuedJun 5, 2025
Inspection record
Inspections32
Passed27
Failed0
  1. Jan 23, 2026

    Insulation

    Approved

    InspectorScot Jandro

  2. Jan 16, 2026

    Framing-New Home

    Approved

    InspectorGodwin Annin

    - metal straps required over garage door header. check at insulation inspection. - ok to insulate the house.
  3. Nov 18, 2025

    Erosion Ctrl/Const Entrance

    Approved, w/ Comments

    InspectorLindsay Evans

    Seasonal Inspection - Fall (update) Both IP devices have been removed and driveway/street have been cleaned
  4. Nov 17, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Seasonal Inspection - Fall In process of moving silt fence back out of ROW - Clean off both entrances of existing driveway - Clean street near entrances and in front of site - Remove both IP devices in front of site
  5. Nov 3, 2025

    Construction Fence

    Approved

    InspectorLindsay Evans

  6. Nov 3, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  7. Oct 21, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  8. Oct 17, 2025

    Construction Fence

    Approved

    InspectorLindsay Evans

  9. Oct 17, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Clean all sediment and debris from driveway entrance area on the right
  10. Oct 2, 2025

    Floor Slab

    Approved

    InspectorBrian Crask

  11. Aug 12, 2025

    Construction Fence

    Approved

    InspectorLindsay Evans

  12. Aug 12, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  13. Aug 11, 2025

    Erosion Ctrl/Const Entrance

    Progress Report

    InspectorLindsay Evans

    Stockpiles have been removed. Will need to sweep existing driveway if continuing to use as entrance
  14. Aug 11, 2025

    Construction Fence

    Progress Report

    InspectorLindsay Evans

    Areas have been taken down temp to allow for various work. Must be reinstalled at end of day.
  15. Aug 8, 2025

    Construction Fence

    Approved

    InspectorLindsay Evans

  16. Aug 8, 2025

    Erosion Ctrl/Const Entrance

    Progress Report

    InspectorLindsay Evans

    Most items were completed Still need double row bio log across driveway at base of stockpile
  17. Aug 7, 2025

    Foundation Pre-Backfil

    Approved

    InspectorTedd Nelson

  18. Aug 7, 2025

    Footing

    Approved

    InspectorTedd Nelson

    - Pad footings in the basement for steel columns
  19. Aug 7, 2025

    Foundation Pre-backfil (Top of foundation survey)

    Approved

    InspectorTedd Nelson

    See Photos for survey
  20. Aug 4, 2025

    Construction Fence

    Approved

    InspectorLindsay Evans

  21. Aug 4, 2025

    Erosion Ctrl/Const Entrance

    Not Approved

    InspectorLindsay Evans

    Sweep the street around site Sweep the remaining accessible portion of the driveway Install a double row of bio logs around the stockpiles Clear debris from in and/or around the catch basins in front of the site
  22. Jul 28, 2025

    Poured Foundation Reinforcement

    Approved

    InspectorGodwin Annin

    - #6 vertical @18 - #6 horizontal 12"
  23. Jul 16, 2025

    Shoring needs to be done before footing inspection

    Approved

    InspectorTedd Nelson

  24. Jul 15, 2025

    Shoring needs to be done before footing inspection

    Not Approved

    InspectorScot Jandro

    North bank does not meet the 1:1 slope. Shoring required (approx 25-30') along north lot line.
  25. Jul 9, 2025

    Construction Fence

    Approved

    InspectorLindsay Evans

Show 7 earlier inspections
  1. Jul 9, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorLindsay Evans

  2. Jun 6, 2025

    Tree Protection (call 952-826-0308)

    Approved, w/ Comments

    InspectorLindsay Evans

    Installed around the 2 trees to be protected on-site.
  3. Jun 6, 2025

    Preconstruction

    Approved, w/ Comments

    InspectorLindsay Evans

    Updated IP devices have been installed (orange bag style in both)
  4. Jun 6, 2025

    Erosion Ctrl/Const Entrance

    Progress Report

    InspectorLindsay Evans

    Have not started project
  5. Jun 2, 2025

    Preconstruction

    Approved, w/ Comments

    InspectorLindsay Evans

    Site looked good. EC in place (silt fence). Site sign up. Using existing driveway as long as possible. Pre construction photos uploaded in PDox. *IP installed in catch basin ID's 5919 & 5918 (however, not approved method and need to install drop-in device). Contractor will send pic or notify me when new ones installed. Per Water Resources: Per City records, a well is unlikely on the lot. If a well is encountered during construction, it must meet the rules set in the City’s Private Well Policy.
  6. Jun 2, 2025

    Tree Protection (call 952-826-0308)

    Progress Report

    InspectorLindsay Evans

    Tree fencing installed for canopy area of 2 neighboring trees. Nothing installed around the 2 trees that are to be protected on this lot. Met contractor on-site for pre-construction inspection and discussed. Tree fencing will get put up around these 2 trees in the next day or two once they have removed some of the larger tree debris from the ones they removed. Will send pic or notify when completed.
  7. May 19, 2025

    Tree Plan

    Approved, w/ Comments

    InspectorLindsay Evans

    See tree escrow permit ED220667- Preserving 2 trees, remove 8 , 65 ft coniferous replacements required. LB