Building
88 Woodland Cir, Edina
New, NEW HOME
- Jan 23, 2026
Insulation
ApprovedInspectorScot Jandro
- Jan 16, 2026
Framing-New Home
ApprovedInspectorGodwin Annin
- metal straps required over garage door header. check at insulation inspection. - ok to insulate the house.
- Nov 18, 2025
Erosion Ctrl/Const Entrance
Approved, w/ CommentsInspectorLindsay Evans
Seasonal Inspection - Fall (update) Both IP devices have been removed and driveway/street have been cleaned
- Nov 17, 2025
Erosion Ctrl/Const Entrance
Not ApprovedInspectorLindsay Evans
Seasonal Inspection - Fall In process of moving silt fence back out of ROW - Clean off both entrances of existing driveway - Clean street near entrances and in front of site - Remove both IP devices in front of site
- Nov 3, 2025
Construction Fence
ApprovedInspectorLindsay Evans
- Nov 3, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Oct 21, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Oct 17, 2025
Construction Fence
ApprovedInspectorLindsay Evans
- Oct 17, 2025
Erosion Ctrl/Const Entrance
Not ApprovedInspectorLindsay Evans
Clean all sediment and debris from driveway entrance area on the right
- Oct 2, 2025
Floor Slab
ApprovedInspectorBrian Crask
- Aug 12, 2025
Construction Fence
ApprovedInspectorLindsay Evans
- Aug 12, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Aug 11, 2025
Erosion Ctrl/Const Entrance
Progress ReportInspectorLindsay Evans
Stockpiles have been removed. Will need to sweep existing driveway if continuing to use as entrance
- Aug 11, 2025
Construction Fence
Progress ReportInspectorLindsay Evans
Areas have been taken down temp to allow for various work. Must be reinstalled at end of day.
- Aug 8, 2025
Construction Fence
ApprovedInspectorLindsay Evans
- Aug 8, 2025
Erosion Ctrl/Const Entrance
Progress ReportInspectorLindsay Evans
Most items were completed Still need double row bio log across driveway at base of stockpile
- Aug 7, 2025
Foundation Pre-Backfil
ApprovedInspectorTedd Nelson
- Aug 7, 2025
Footing
ApprovedInspectorTedd Nelson
- Pad footings in the basement for steel columns
- Aug 7, 2025
Foundation Pre-backfil (Top of foundation survey)
ApprovedInspectorTedd Nelson
See Photos for survey
- Aug 4, 2025
Construction Fence
ApprovedInspectorLindsay Evans
- Aug 4, 2025
Erosion Ctrl/Const Entrance
Not ApprovedInspectorLindsay Evans
Sweep the street around site Sweep the remaining accessible portion of the driveway Install a double row of bio logs around the stockpiles Clear debris from in and/or around the catch basins in front of the site
- Jul 28, 2025
Poured Foundation Reinforcement
ApprovedInspectorGodwin Annin
- #6 vertical @18 - #6 horizontal 12"
- Jul 16, 2025
Shoring needs to be done before footing inspection
ApprovedInspectorTedd Nelson
- Jul 15, 2025
Shoring needs to be done before footing inspection
Not ApprovedInspectorScot Jandro
North bank does not meet the 1:1 slope. Shoring required (approx 25-30') along north lot line.
- Jul 9, 2025
Construction Fence
ApprovedInspectorLindsay Evans
Show 7 earlier inspections
- Jul 9, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Jun 6, 2025
Tree Protection (call 952-826-0308)
Approved, w/ CommentsInspectorLindsay Evans
Installed around the 2 trees to be protected on-site.
- Jun 6, 2025
Preconstruction
Approved, w/ CommentsInspectorLindsay Evans
Updated IP devices have been installed (orange bag style in both)
- Jun 6, 2025
Erosion Ctrl/Const Entrance
Progress ReportInspectorLindsay Evans
Have not started project
- Jun 2, 2025
Preconstruction
Approved, w/ CommentsInspectorLindsay Evans
Site looked good. EC in place (silt fence). Site sign up. Using existing driveway as long as possible. Pre construction photos uploaded in PDox. *IP installed in catch basin ID's 5919 & 5918 (however, not approved method and need to install drop-in device). Contractor will send pic or notify me when new ones installed. Per Water Resources: Per City records, a well is unlikely on the lot. If a well is encountered during construction, it must meet the rules set in the City’s Private Well Policy.
- Jun 2, 2025
Tree Protection (call 952-826-0308)
Progress ReportInspectorLindsay Evans
Tree fencing installed for canopy area of 2 neighboring trees. Nothing installed around the 2 trees that are to be protected on this lot. Met contractor on-site for pre-construction inspection and discussed. Tree fencing will get put up around these 2 trees in the next day or two once they have removed some of the larger tree debris from the ones they removed. Will send pic or notify when completed.
- May 19, 2025
Tree Plan
Approved, w/ CommentsInspectorLindsay Evans
See tree escrow permit ED220667- Preserving 2 trees, remove 8 , 65 ft coniferous replacements required. LB