#ED222199Building
6566 France Ave S 705, Edina
IssuedJul 7, 2025
StatusUnknown
Value$100,000
Inspections10
Scope of work
Alteration/Remodel, Remodeling of the entire condo unit.
Location context
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$500
Total paid$500
Timeline
ApprovedJun 3, 2025
IssuedJul 7, 2025
Inspection record
Inspections10
Passed7
Failed0
- Sep 22, 2025
Firestop Systems
ApprovedInspectorTedd Nelson
- Sep 22, 2025
Gypsum/FR Construction
ApprovedInspectorTedd Nelson
- Aug 21, 2025
Framing
ApprovedInspectorTedd Nelson
- Aug 21, 2025
Insulation
ApprovedInspectorTedd Nelson
- Aug 21, 2025
Firestop Systems
Partial ApprovalInspectorTedd Nelson
- All penetrations are fire stopped from 8/14/2025 corrections in the floor. via emailed photos
- Aug 21, 2025
Bldg Progress
Progress ReportInspectorTedd Nelson
- Need Plumbing rough-in inspection prior to covering
- Aug 19, 2025
Final (includes smoke and CO alarms)
Progress ReportInspectorJim Anderson
As of 8/19 Plumbing work being done with no Plumbing permit
- Aug 14, 2025
Framing
Not ApprovedInspectorTedd Nelson
- Need to remove wood framed soffit and door infill and replace with steel studs
- Aug 14, 2025
Insulation
Not ApprovedInspectorTedd Nelson
- Insulation is required in the corridor wall
- Aug 14, 2025
Gypsum/FR Construction
Progress ReportInspectorTedd Nelson
- Fire caulk the floor penetration (take a picture) - Insulate corridor wall (take a picture) - Gyp. the corridor walls with 5/8" type X to deck then call for inspection