PULLFIRST[THE RECORD]
Permit / Edina← Search
#ED224893

Building

4389 Mackey Ave, Edina

IssuedSep 24, 2025
StatusUnknown
Value$75,000
Inspections7
Scope of work

Alteration/Remodel, Primary bedroom and bathroom remodel

Location context
Parcel1802824220021
Coordinates44.91926, -93.34832
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$375
Total paid$375
Timeline
ApprovedSep 24, 2025
IssuedSep 24, 2025
Inspection record
Inspections7
Passed7
Failed0
  1. Jan 20, 2026

    Insulation

    Approved

    InspectorBrian Crask

  2. Jan 20, 2026

    Final (includes smoke and CO alarms)

    Approved

    InspectorPeter Akmenkalns

  3. Nov 14, 2025

    Framing

    Approved

    InspectorPeter Akmenkalns

    joist repairs done
  4. Nov 13, 2025

    Insulation

    Approved, w/ Comments

    InspectorBrian Crask

    Okay to rock walls and ceiling. The insulation on walls and ceiling is approved. Need framing inspection approved for full approval of insulation inspection.
  5. Nov 13, 2025

    Framing

    Partial Approval

    InspectorBrian Crask

    Framing of walls and ceiling is approved. -Need engineered fix for floor joist boring outside of the middle 1/3 for toilet drain and shower drain.
  6. Nov 10, 2025

    Insulation

    Not Approved

    InspectorBrian Crask

    -Need framing approved before insulation can be approved.] -Missing fire-blocking in 8 locations at top and bottom plate penetrations -Need to seal attic from garage.
  7. Nov 5, 2025

    Framing

    Not Approved

    InspectorBrian Crask

    -Need tape on ends of R-8V for existing bathfan. -Need engineered fix for floor joist boring outside of the middle 1/3 for toilet drain and shower drain. Note: OK to insulate

Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.