#ED223925

Building

5115 Arcadia Ave, Edina

IssuedOct 16, 2025
StatusUnknown
Value$2,185,700
Inspections236
Scope of work

New, FOOTING & FOUNDATION ONLY

Location context
Parcel2811721310010
Coordinates44.91115, -93.35231
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$10,925
Total paid$10,925
Timeline
ApprovedOct 16, 2025
IssuedOct 16, 2025
Inspection record
Inspections236
Passed179
Failed0
  1. May 29, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  2. May 28, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  3. May 27, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  4. May 26, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  5. May 22, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorTedd Nelson

  6. May 21, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorTedd Nelson

  7. May 20, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorTedd Nelson

  8. May 19, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorTedd Nelson

  9. May 18, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorTedd Nelson

  10. May 15, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  11. May 14, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorTedd Nelson

  12. May 13, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  13. May 12, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  14. May 11, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  15. May 7, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorTedd Nelson

  16. May 6, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorTedd Nelson

  17. May 5, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  18. May 1, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  19. Apr 30, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  20. Apr 29, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  21. Apr 28, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorTedd Nelson

  22. Apr 27, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  23. Apr 24, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorTedd Nelson

  24. Apr 23, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorTedd Nelson

  25. Apr 22, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorTedd Nelson

Show 211 earlier inspections
  1. Apr 21, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorTedd Nelson

  2. Apr 20, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorTedd Nelson

  3. Apr 17, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  4. Apr 16, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  5. Apr 15, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  6. Apr 14, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  7. Apr 13, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  8. Apr 10, 2026·11:00 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorTedd Nelson

  9. Apr 8, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  10. Apr 8, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  11. Apr 8, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Columns level 3, Grids: E2, E3, E4, D1, D2, D3, C3, B5
  12. Apr 7, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Columns level 3, Grids: B1, B2, B3, B4, C1, C2
  13. Apr 7, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  14. Apr 7, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  15. Apr 6, 2026

    Floor Slab

    Partial Approval

    InspectorTedd Nelson

    - PT deck pour level 3 at Grids B to E and 1 to 6
  16. Apr 6, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  17. Apr 6, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  18. Apr 2, 2026

    Erosion Ctrl/Const Entrance

    Approved

    InspectorPeter Akmenkalns

  19. Apr 2, 2026

    Construction Fence

    Approved

    InspectorPeter Akmenkalns

  20. Apr 2, 2026

    Floor Slab

    Cancelled

    InspectorPeter Akmenkalns

    weather
  21. Apr 1, 2026

    Construction Fence

    Partial Approval

    InspectorPeter Akmenkalns

  22. Apr 1, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorPeter Akmenkalns

  23. Apr 1, 2026

    Floor Slab

    Partial Approval

    InspectorPeter Akmenkalns

    1-5.5 A-E wast half level 3
  24. Mar 31, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Columns, 2nd level, Grids 8C, 8D 8B, 8E, 9B
  25. Mar 31, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorPeter Akmenkalns

  26. Mar 31, 2026

    Poured Foundation Reinforcement

    Partial Approval

    InspectorTedd Nelson

    - 2nd level shear wall at Grid: 8; C to D
  27. Mar 31, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  28. Mar 27, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  29. Mar 27, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Columns level 2, Grids 7B, 7C, 7D, 7D, 9C and 9D
  30. Mar 27, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  31. Mar 26, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  32. Mar 26, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  33. Mar 26, 2026

    Floor Slab

    Partial Approval

    InspectorTedd Nelson

    - PT deck pour, level 2 Grids 6 to 9 and A to E
  34. Mar 25, 2026

    Poured Foundation Reinforcement

    Partial Approval

    InspectorTedd Nelson

    - Perimeter wall at Grids: 1; E to J
  35. Mar 25, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  36. Mar 24, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Columns level 2 ramp , at Grids 9C and 9D
  37. Mar 24, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  38. Mar 24, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  39. Mar 24, 2026

    Floor Slab

    Partial Approval

    InspectorTedd Nelson

    - PT pour ramp level 2
  40. Mar 23, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  41. Mar 20, 2026

    Poured Foundation Reinforcement

    Partial Approval

    InspectorScot Jandro

    - Level 2 Elevator and stair shaft walls west core
  42. Mar 19, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  43. Mar 19, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  44. Mar 19, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Columns level 2 at Grids: 3E, 4E, 4D
  45. Mar 18, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorScot Jandro

    -Columns level 2 at Grids 3B, 4B, 5B, 5C
  46. Mar 17, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorScot Jandro

    -Columns level 2 at Grids 1A, 2A, 1B, 2B
  47. Mar 12, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Columns level 1 at Grids: 9A, 9B, 9C, 9D
  48. Mar 12, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  49. Mar 12, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  50. Mar 11, 2026

    Floor Slab

    Partial Approval

    InspectorTedd Nelson

    - - Level 2 Deck pour, Area A, west side
  51. Mar 11, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Columns Level 1 at Grids: 7A, 7B, 8A, 8B
  52. Mar 11, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  53. Mar 11, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  54. Mar 10, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Columns, level 1 at Grids: 7D, 7E, 8E, 9E
  55. Mar 10, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  56. Mar 10, 2026

    Poured Foundation Reinforcement

    Partial Approval

    InspectorTedd Nelson

    - Shear wall with columns, level 1 at Grid: 8; C to D
  57. Mar 10, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  58. Mar 9, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  59. Mar 9, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  60. Mar 9, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Columns level 1 at Grids: 1D, 2D, 6A, 6B, 6C, 6D, 6E
  61. Mar 6, 2026

    Poured Wall/Column (above grade)

    Cancelled

    InspectorPeter Akmenkalns

  62. Mar 6, 2026

    Erosion Ctrl/Const Entrance

    Cancelled

    InspectorPeter Akmenkalns

  63. Mar 6, 2026

    Construction Fence

    Cancelled

    InspectorPeter Akmenkalns

  64. Mar 5, 2026

    Construction Fence

    Partial Approval

    InspectorPeter Akmenkalns

  65. Mar 5, 2026

    Poured Foundation Reinforcement

    Partial Approval

    InspectorPeter Akmenkalns

    deck pour level 1 6-9 A-E
  66. Mar 5, 2026

    Erosion Ctrl/Const Entrance

    Approved

    InspectorPeter Akmenkalns

  67. Mar 4, 2026

    Construction Fence

    Partial Approval

    InspectorPeter Akmenkalns

  68. Mar 4, 2026

    Poured Foundation Reinforcement

    Partial Approval

    InspectorPeter Akmenkalns

    E-3 2-D 2 Columuns
  69. Mar 4, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorPeter Akmenkalns

  70. Mar 3, 2026

    Construction Fence

    Partial Approval

    InspectorPeter Akmenkalns

  71. Mar 3, 2026

    Poured Foundation Reinforcement

    Partial Approval

    InspectorPeter Akmenkalns

    P1 to level 1 ramp and pockets on exterior wall
  72. Mar 3, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorPeter Akmenkalns

  73. Mar 2, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  74. Mar 2, 2026

    Poured Foundation Reinforcement

    Partial Approval

    InspectorTedd Nelson

    - Level 1 Elevator and stair shaft walls
  75. Mar 2, 2026

    Floor Slab

    Partial Approval

    InspectorTedd Nelson

    - Ramp pour to level 1
  76. Mar 2, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  77. Feb 26, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Columns at Level 1, E4, E5, D5
  78. Feb 26, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  79. Feb 26, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  80. Feb 25, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  81. Feb 25, 2026

    Footing

    Partial Approval

    InspectorTedd Nelson

    - Grid: 1; E to G
  82. Feb 25, 2026

    Floor Slab

    Partial Approval

    InspectorTedd Nelson

    - PT deck pour, level 1 from Grids: 1 to 6 and C to E
  83. Feb 25, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  84. Feb 24, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  85. Feb 24, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Columns level 1 at Grids: C1, C2, C5, C6
  86. Feb 24, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  87. Feb 23, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Columns level 1 at Grids: 1B, 2A, 2B, 3A, 3B, 4A, 4B
  88. Feb 23, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  89. Feb 23, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  90. Feb 20, 2026

    Poured Foundation Reinforcement

    Partial Approval

    InspectorPeter Akmenkalns

    perimeter wall section 5-6 J-H
  91. Feb 20, 2026·11:30 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  92. Feb 20, 2026

    Construction Fence

    Partial Approval

    InspectorPeter Akmenkalns

  93. Feb 20, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorPeter Akmenkalns

  94. Feb 19, 2026·11:30 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  95. Feb 19, 2026

    Footing

    Partial Approval

    InspectorPeter Akmenkalns

    5-6 J-H perimeter wall footing
  96. Feb 19, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorPeter Akmenkalns

  97. Feb 19, 2026

    Construction Fence

    Partial Approval

    InspectorPeter Akmenkalns

  98. Feb 18, 2026

    Floor Slab

    Partial Approval

    InspectorPeter Akmenkalns

  99. Feb 18, 2026·11:30 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  100. Feb 18, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorPeter Akmenkalns

  101. Feb 18, 2026

    Construction Fence

    Partial Approval

    InspectorPeter Akmenkalns

  102. Feb 17, 2026

    Construction Fence

    Partial Approval

    InspectorPeter Akmenkalns

  103. Feb 17, 2026·11:30 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorPeter Akmenkalns

  104. Feb 17, 2026

    Poured Foundation Reinforcement

    Partial Approval

    InspectorPeter Akmenkalns

    - 5.5 to 4.4 on J
  105. Feb 17, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorPeter Akmenkalns

  106. Feb 13, 2026

    Floor Slab

    Partial Approval

    InspectorTedd Nelson

    - Part of ramp at Grid: 9; B to C
  107. Feb 13, 2026·11:30 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorTedd Nelson

  108. Feb 13, 2026

    Poured Foundation Reinforcement

    Partial Approval

    InspectorTedd Nelson

    - Shear wall P2 level at Grid: 8; C to D.5
  109. Feb 13, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Columns P2 level at Grids: 6C,7E, 8A, 8B, 8C, 8D, 8E
  110. Feb 13, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  111. Feb 13, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  112. Feb 12, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  113. Feb 12, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Columns P1 level at Grids: A to B, 6, ,7, 8, 9
  114. Feb 12, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  115. Feb 12, 2026·11:30 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorTedd Nelson

  116. Feb 11, 2026·11:30 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorTedd Nelson

  117. Feb 10, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Columns P1 level at Grids: D1, D2, D5, E2, E3, E4, E5, A5
  118. Feb 10, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  119. Feb 10, 2026·11:30 AM - 12:00 PM

    Poured Foundation Reinforcement

    scheduled

    InspectorScot Jandro

  120. Feb 10, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  121. Feb 6, 2026

    Footing

    Partial Approval

    InspectorPeter Akmenkalns

    strip footing g.5 -j.5
  122. Feb 6, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorPeter Akmenkalns

  123. Feb 6, 2026

    Construction Fence

    Partial Approval

    InspectorPeter Akmenkalns

  124. Feb 5, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorPeter Akmenkalns

  125. Feb 5, 2026

    Floor Slab

    Approved

    InspectorPeter Akmenkalns

    DECK POUR C.2-E 5.5-1
  126. Feb 4, 2026

    Construction Fence

    Partial Approval

    InspectorPeter Akmenkalns

  127. Feb 4, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorPeter Akmenkalns

  128. Feb 4, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorPeter Akmenkalns

    coulummsn p1 A 2-3 B 2,3,4,5
  129. Feb 3, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  130. Feb 3, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Columns on P1 level, Area A at Grids: 1B, 2B, 3B, 4B, 5B, 1C and 2A
  131. Feb 3, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  132. Feb 2, 2026

    Floor Slab

    No Physical Inspection Done

    InspectorPeter Akmenkalns

    pouring what was looked at on monday will need rest of week for columns and floor pour
  133. Jan 29, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  134. Jan 29, 2026

    Footing

    Partial Approval

    InspectorTedd Nelson

    - Grids: 5 to 6 and G to J
  135. Jan 29, 2026

    Floor Slab

    Partial Approval

    InspectorTedd Nelson

    - 1st PT deck pour 1st level north end, area B
  136. Jan 29, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  137. Jan 28, 2026

    Poured Foundation Reinforcement

    Cancelled

    InspectorTedd Nelson

  138. Jan 27, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Grade level columns at Grids: 9D and 9E
  139. Jan 27, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  140. Jan 27, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  141. Jan 26, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  142. Jan 26, 2026

    Poured Foundation Reinforcement

    Cancelled

    InspectorTedd Nelson

  143. Jan 26, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  144. Jan 23, 2026

    Poured Foundation Reinforcement

    Cancelled

    InspectorPeter Akmenkalns

  145. Jan 22, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorPeter Akmenkalns

  146. Jan 22, 2026

    Poured Foundation Reinforcement

    Cancelled

    InspectorPeter Akmenkalns

  147. Jan 21, 2026

    Poured Foundation Reinforcement

    Partial Approval

    InspectorPeter Akmenkalns

    SR corner angle wall EXTERIOR FOUNDATION E.6-6 9-8
  148. Jan 20, 2026

    Poured Foundation Reinforcement

    Cancelled

    InspectorTedd Nelson

  149. Jan 16, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  150. Jan 16, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  151. Jan 16, 2026

    Poured Foundation Reinforcement

    Partial Approval

    InspectorTedd Nelson

    - Poured wall South east exterior, between 6 to 9
  152. Jan 16, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Grade level column at Grid: 8F.5
  153. Jan 15, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  154. Jan 15, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  155. Jan 15, 2026

    Poured Foundation Reinforcement

    Partial Approval

    InspectorTedd Nelson

    - Ramp wall P2 level at Grid: 8; C-D.5
  156. Jan 14, 2026

    Footing

    Cancelled

    InspectorTedd Nelson

  157. Jan 13, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  158. Jan 13, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  159. Jan 13, 2026

    Poured Foundation Reinforcement

    Partial Approval

    InspectorTedd Nelson

    - Foundation wall, lower level Grids: 9; D to E
  160. Jan 13, 2026

    Footing

    Partial Approval

    InspectorTedd Nelson

    - Southeast exterior, between Grid 6 and 9
  161. Jan 13, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Grade level columns at Grids: 6E, 7E, 8E
  162. Jan 12, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  163. Jan 12, 2026

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  164. Jan 12, 2026

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Grade level columns at Grids: B7, B8, B9 and E5
  165. Jan 9, 2026

    Footing

    Partial Approval

    InspectorPeter Akmenkalns

    4 pad footings on E 8,7,6,4
  166. Jan 8, 2026

    Poured Foundation Reinforcement

    Partial Approval

    InspectorPeter Akmenkalns

    EXTERIOR FOUNDATION WALL 9 C-E
  167. Jan 8, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorPeter Akmenkalns

  168. Jan 7, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorPeter Akmenkalns

  169. Jan 7, 2026

    Footing

    Partial Approval

    InspectorPeter Akmenkalns

    pads for columns 7-8 C AND D
  170. Jan 7, 2026

    Poured Foundation Reinforcement

    Partial Approval

    InspectorPeter Akmenkalns

    4 coulums on D 2 3 4 6
  171. Jan 6, 2026

    Footing

    Partial Approval

    InspectorPeter Akmenkalns

    permiter foundation wall 6-9 A-B.5
  172. Jan 6, 2026

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorPeter Akmenkalns

  173. Dec 31, 2025

    Poured Foundation Reinforcement

    Cancelled

    InspectorTedd Nelson

  174. Dec 30, 2025

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  175. Dec 30, 2025

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  176. Dec 30, 2025

    Poured Foundation Reinforcement

    Partial Approval

    InspectorTedd Nelson

    - Lower level foundation wall pour at Grid: 1; C to E
  177. Dec 30, 2025

    Footing

    Partial Approval

    InspectorTedd Nelson

    - Pads at Grids: 5C, 5D, 6C, 6D
  178. Dec 30, 2025

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorTedd Nelson

    - Column at slab level, Grids: 5A and 6A
  179. Dec 29, 2025

    Footing

    Cancelled

    InspectorPeter Akmenkalns

    snow storm deylaed on schedule for tomorrow
  180. Dec 23, 2025

    Poured Wall/Column (above grade)

    Partial Approval

    InspectorRick Chase

    Grid A 2,3 & 4 West wall Grid B1 between D& E generally 50 LF
  181. Dec 19, 2025

    Poured Foundation Reinforcement

    Cancelled

    InspectorTedd Nelson

  182. Dec 18, 2025

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  183. Dec 18, 2025

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  184. Dec 18, 2025

    Footing

    Partial Approval

    InspectorTedd Nelson

    - Pads at Grids: 3B, 3C, 3D, 3E, 3F, 4B, 4C, 4D, 4E, 4F
  185. Dec 18, 2025

    Poured Foundation Reinforcement

    Partial Approval

    InspectorTedd Nelson

    - P2 level poured wall at Grids: A; 4 to 6,5
  186. Dec 17, 2025

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  187. Dec 17, 2025

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  188. Dec 17, 2025

    Footing

    Partial Approval

    InspectorTedd Nelson

    - Pad at Grid E3
  189. Dec 16, 2025

    Poured Foundation Reinforcement

    Partial Approval

    InspectorTedd Nelson

    - P2 level poured wall at Grids: A; 1 to 4 - Center knee wall between the elevator and stair shaft
  190. Dec 16, 2025

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  191. Dec 16, 2025

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  192. Dec 16, 2025

    Footing

    Partial Approval

    InspectorTedd Nelson

    - Pad at Grid E2
  193. Dec 9, 2025

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  194. Dec 9, 2025

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  195. Dec 9, 2025

    Footing

    Partial Approval

    InspectorTedd Nelson

    - Continuous footing at Grids: A; 1 to 3.5 and 1; A to C.5
  196. Dec 5, 2025

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  197. Dec 5, 2025

    Footing

    Partial Approval

    InspectorTedd Nelson

    - Elevator and stair pad - Elevator drain pipe is installed
  198. Dec 5, 2025

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  199. Dec 4, 2025

    Footing

    Cancelled

    InspectorTedd Nelson

  200. Dec 2, 2025

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  201. Dec 2, 2025

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  202. Dec 2, 2025

    Footing

    Partial Approval

    InspectorTedd Nelson

    - Continuous footing at Grid: A; 3.5 to 6.5 - Pads at Grids: A3, A4, A5, A6
  203. Nov 26, 2025

    Footing

    Partial Approval

    InspectorPeter Akmenkalns

    permiter strip footings NE corner including 2 pads on interior and 6 in strip footing: A 6.5 9 E-.5
  204. Nov 26, 2025

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorPeter Akmenkalns

  205. Nov 26, 2025

    Construction Fence

    Partial Approval

    InspectorPeter Akmenkalns

  206. Nov 20, 2025

    Footing

    Partial Approval

    InspectorTedd Nelson

    - Tower crane pad
  207. Nov 20, 2025

    Construction Fence

    Partial Approval

    InspectorTedd Nelson

  208. Nov 20, 2025

    Erosion Ctrl/Const Entrance

    Partial Approval

    InspectorTedd Nelson

  209. Nov 20, 2025

    Preconstruction

    Progress Report

    InspectorTedd Nelson

    - Conversation with the JS Craig on how the footing, wall and pad pours are going to go
  210. Nov 18, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorPeter Akmenkalns

  211. Nov 18, 2025

    Footing

    Partial Approval

    InspectorPeter Akmenkalns

    rat slab to set forms on for crane pad

Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.