Building
5115 Arcadia Ave, Edina
New, FOOTING & FOUNDATION ONLY
- May 29, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- May 28, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- May 27, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- May 26, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- May 22, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorTedd Nelson
- May 21, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorTedd Nelson
- May 20, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorTedd Nelson
- May 19, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorTedd Nelson
- May 18, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorTedd Nelson
- May 15, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- May 14, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorTedd Nelson
- May 13, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- May 12, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- May 11, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- May 7, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorTedd Nelson
- May 6, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorTedd Nelson
- May 5, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- May 1, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- Apr 30, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- Apr 29, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- Apr 28, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorTedd Nelson
- Apr 27, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- Apr 24, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorTedd Nelson
- Apr 23, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorTedd Nelson
- Apr 22, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorTedd Nelson
Show 211 earlier inspections
- Apr 21, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorTedd Nelson
- Apr 20, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorTedd Nelson
- Apr 17, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- Apr 16, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- Apr 15, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- Apr 14, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- Apr 13, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- Apr 10, 2026·11:00 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorTedd Nelson
- Apr 8, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Apr 8, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Apr 8, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Columns level 3, Grids: E2, E3, E4, D1, D2, D3, C3, B5
- Apr 7, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Columns level 3, Grids: B1, B2, B3, B4, C1, C2
- Apr 7, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Apr 7, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Apr 6, 2026
Floor Slab
Partial ApprovalInspectorTedd Nelson
- PT deck pour level 3 at Grids B to E and 1 to 6
- Apr 6, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Apr 6, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Apr 2, 2026
Erosion Ctrl/Const Entrance
ApprovedInspectorPeter Akmenkalns
- Apr 2, 2026
Construction Fence
ApprovedInspectorPeter Akmenkalns
- Apr 2, 2026
Floor Slab
CancelledInspectorPeter Akmenkalns
weather
- Apr 1, 2026
Construction Fence
Partial ApprovalInspectorPeter Akmenkalns
- Apr 1, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorPeter Akmenkalns
- Apr 1, 2026
Floor Slab
Partial ApprovalInspectorPeter Akmenkalns
1-5.5 A-E wast half level 3
- Mar 31, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Columns, 2nd level, Grids 8C, 8D 8B, 8E, 9B
- Mar 31, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorPeter Akmenkalns
- Mar 31, 2026
Poured Foundation Reinforcement
Partial ApprovalInspectorTedd Nelson
- 2nd level shear wall at Grid: 8; C to D
- Mar 31, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Mar 27, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Mar 27, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Columns level 2, Grids 7B, 7C, 7D, 7D, 9C and 9D
- Mar 27, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Mar 26, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Mar 26, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Mar 26, 2026
Floor Slab
Partial ApprovalInspectorTedd Nelson
- PT deck pour, level 2 Grids 6 to 9 and A to E
- Mar 25, 2026
Poured Foundation Reinforcement
Partial ApprovalInspectorTedd Nelson
- Perimeter wall at Grids: 1; E to J
- Mar 25, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Mar 24, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Columns level 2 ramp , at Grids 9C and 9D
- Mar 24, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Mar 24, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Mar 24, 2026
Floor Slab
Partial ApprovalInspectorTedd Nelson
- PT pour ramp level 2
- Mar 23, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Mar 20, 2026
Poured Foundation Reinforcement
Partial ApprovalInspectorScot Jandro
- Level 2 Elevator and stair shaft walls west core
- Mar 19, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Mar 19, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Mar 19, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Columns level 2 at Grids: 3E, 4E, 4D
- Mar 18, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorScot Jandro
-Columns level 2 at Grids 3B, 4B, 5B, 5C
- Mar 17, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorScot Jandro
-Columns level 2 at Grids 1A, 2A, 1B, 2B
- Mar 12, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Columns level 1 at Grids: 9A, 9B, 9C, 9D
- Mar 12, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Mar 12, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Mar 11, 2026
Floor Slab
Partial ApprovalInspectorTedd Nelson
- - Level 2 Deck pour, Area A, west side
- Mar 11, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Columns Level 1 at Grids: 7A, 7B, 8A, 8B
- Mar 11, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Mar 11, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Mar 10, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Columns, level 1 at Grids: 7D, 7E, 8E, 9E
- Mar 10, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Mar 10, 2026
Poured Foundation Reinforcement
Partial ApprovalInspectorTedd Nelson
- Shear wall with columns, level 1 at Grid: 8; C to D
- Mar 10, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Mar 9, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Mar 9, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Mar 9, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Columns level 1 at Grids: 1D, 2D, 6A, 6B, 6C, 6D, 6E
- Mar 6, 2026
Poured Wall/Column (above grade)
CancelledInspectorPeter Akmenkalns
- Mar 6, 2026
Erosion Ctrl/Const Entrance
CancelledInspectorPeter Akmenkalns
- Mar 6, 2026
Construction Fence
CancelledInspectorPeter Akmenkalns
- Mar 5, 2026
Construction Fence
Partial ApprovalInspectorPeter Akmenkalns
- Mar 5, 2026
Poured Foundation Reinforcement
Partial ApprovalInspectorPeter Akmenkalns
deck pour level 1 6-9 A-E
- Mar 5, 2026
Erosion Ctrl/Const Entrance
ApprovedInspectorPeter Akmenkalns
- Mar 4, 2026
Construction Fence
Partial ApprovalInspectorPeter Akmenkalns
- Mar 4, 2026
Poured Foundation Reinforcement
Partial ApprovalInspectorPeter Akmenkalns
E-3 2-D 2 Columuns
- Mar 4, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorPeter Akmenkalns
- Mar 3, 2026
Construction Fence
Partial ApprovalInspectorPeter Akmenkalns
- Mar 3, 2026
Poured Foundation Reinforcement
Partial ApprovalInspectorPeter Akmenkalns
P1 to level 1 ramp and pockets on exterior wall
- Mar 3, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorPeter Akmenkalns
- Mar 2, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Mar 2, 2026
Poured Foundation Reinforcement
Partial ApprovalInspectorTedd Nelson
- Level 1 Elevator and stair shaft walls
- Mar 2, 2026
Floor Slab
Partial ApprovalInspectorTedd Nelson
- Ramp pour to level 1
- Mar 2, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Feb 26, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Columns at Level 1, E4, E5, D5
- Feb 26, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Feb 26, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Feb 25, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Feb 25, 2026
Footing
Partial ApprovalInspectorTedd Nelson
- Grid: 1; E to G
- Feb 25, 2026
Floor Slab
Partial ApprovalInspectorTedd Nelson
- PT deck pour, level 1 from Grids: 1 to 6 and C to E
- Feb 25, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Feb 24, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Feb 24, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Columns level 1 at Grids: C1, C2, C5, C6
- Feb 24, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Feb 23, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Columns level 1 at Grids: 1B, 2A, 2B, 3A, 3B, 4A, 4B
- Feb 23, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Feb 23, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Feb 20, 2026
Poured Foundation Reinforcement
Partial ApprovalInspectorPeter Akmenkalns
perimeter wall section 5-6 J-H
- Feb 20, 2026·11:30 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- Feb 20, 2026
Construction Fence
Partial ApprovalInspectorPeter Akmenkalns
- Feb 20, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorPeter Akmenkalns
- Feb 19, 2026·11:30 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- Feb 19, 2026
Footing
Partial ApprovalInspectorPeter Akmenkalns
5-6 J-H perimeter wall footing
- Feb 19, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorPeter Akmenkalns
- Feb 19, 2026
Construction Fence
Partial ApprovalInspectorPeter Akmenkalns
- Feb 18, 2026
Floor Slab
Partial ApprovalInspectorPeter Akmenkalns
- Feb 18, 2026·11:30 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- Feb 18, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorPeter Akmenkalns
- Feb 18, 2026
Construction Fence
Partial ApprovalInspectorPeter Akmenkalns
- Feb 17, 2026
Construction Fence
Partial ApprovalInspectorPeter Akmenkalns
- Feb 17, 2026·11:30 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorPeter Akmenkalns
- Feb 17, 2026
Poured Foundation Reinforcement
Partial ApprovalInspectorPeter Akmenkalns
- 5.5 to 4.4 on J
- Feb 17, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorPeter Akmenkalns
- Feb 13, 2026
Floor Slab
Partial ApprovalInspectorTedd Nelson
- Part of ramp at Grid: 9; B to C
- Feb 13, 2026·11:30 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorTedd Nelson
- Feb 13, 2026
Poured Foundation Reinforcement
Partial ApprovalInspectorTedd Nelson
- Shear wall P2 level at Grid: 8; C to D.5
- Feb 13, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Columns P2 level at Grids: 6C,7E, 8A, 8B, 8C, 8D, 8E
- Feb 13, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Feb 13, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Feb 12, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Feb 12, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Columns P1 level at Grids: A to B, 6, ,7, 8, 9
- Feb 12, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Feb 12, 2026·11:30 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorTedd Nelson
- Feb 11, 2026·11:30 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorTedd Nelson
- Feb 10, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Columns P1 level at Grids: D1, D2, D5, E2, E3, E4, E5, A5
- Feb 10, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Feb 10, 2026·11:30 AM - 12:00 PM
Poured Foundation Reinforcement
scheduledInspectorScot Jandro
- Feb 10, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Feb 6, 2026
Footing
Partial ApprovalInspectorPeter Akmenkalns
strip footing g.5 -j.5
- Feb 6, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorPeter Akmenkalns
- Feb 6, 2026
Construction Fence
Partial ApprovalInspectorPeter Akmenkalns
- Feb 5, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorPeter Akmenkalns
- Feb 5, 2026
Floor Slab
ApprovedInspectorPeter Akmenkalns
DECK POUR C.2-E 5.5-1
- Feb 4, 2026
Construction Fence
Partial ApprovalInspectorPeter Akmenkalns
- Feb 4, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorPeter Akmenkalns
- Feb 4, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorPeter Akmenkalns
coulummsn p1 A 2-3 B 2,3,4,5
- Feb 3, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Feb 3, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Columns on P1 level, Area A at Grids: 1B, 2B, 3B, 4B, 5B, 1C and 2A
- Feb 3, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Feb 2, 2026
Floor Slab
No Physical Inspection DoneInspectorPeter Akmenkalns
pouring what was looked at on monday will need rest of week for columns and floor pour
- Jan 29, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Jan 29, 2026
Footing
Partial ApprovalInspectorTedd Nelson
- Grids: 5 to 6 and G to J
- Jan 29, 2026
Floor Slab
Partial ApprovalInspectorTedd Nelson
- 1st PT deck pour 1st level north end, area B
- Jan 29, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Jan 28, 2026
Poured Foundation Reinforcement
CancelledInspectorTedd Nelson
- Jan 27, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Grade level columns at Grids: 9D and 9E
- Jan 27, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Jan 27, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Jan 26, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Jan 26, 2026
Poured Foundation Reinforcement
CancelledInspectorTedd Nelson
- Jan 26, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Jan 23, 2026
Poured Foundation Reinforcement
CancelledInspectorPeter Akmenkalns
- Jan 22, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorPeter Akmenkalns
- Jan 22, 2026
Poured Foundation Reinforcement
CancelledInspectorPeter Akmenkalns
- Jan 21, 2026
Poured Foundation Reinforcement
Partial ApprovalInspectorPeter Akmenkalns
SR corner angle wall EXTERIOR FOUNDATION E.6-6 9-8
- Jan 20, 2026
Poured Foundation Reinforcement
CancelledInspectorTedd Nelson
- Jan 16, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Jan 16, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Jan 16, 2026
Poured Foundation Reinforcement
Partial ApprovalInspectorTedd Nelson
- Poured wall South east exterior, between 6 to 9
- Jan 16, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Grade level column at Grid: 8F.5
- Jan 15, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Jan 15, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Jan 15, 2026
Poured Foundation Reinforcement
Partial ApprovalInspectorTedd Nelson
- Ramp wall P2 level at Grid: 8; C-D.5
- Jan 14, 2026
Footing
CancelledInspectorTedd Nelson
- Jan 13, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Jan 13, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Jan 13, 2026
Poured Foundation Reinforcement
Partial ApprovalInspectorTedd Nelson
- Foundation wall, lower level Grids: 9; D to E
- Jan 13, 2026
Footing
Partial ApprovalInspectorTedd Nelson
- Southeast exterior, between Grid 6 and 9
- Jan 13, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Grade level columns at Grids: 6E, 7E, 8E
- Jan 12, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Jan 12, 2026
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Jan 12, 2026
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Grade level columns at Grids: B7, B8, B9 and E5
- Jan 9, 2026
Footing
Partial ApprovalInspectorPeter Akmenkalns
4 pad footings on E 8,7,6,4
- Jan 8, 2026
Poured Foundation Reinforcement
Partial ApprovalInspectorPeter Akmenkalns
EXTERIOR FOUNDATION WALL 9 C-E
- Jan 8, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorPeter Akmenkalns
- Jan 7, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorPeter Akmenkalns
- Jan 7, 2026
Footing
Partial ApprovalInspectorPeter Akmenkalns
pads for columns 7-8 C AND D
- Jan 7, 2026
Poured Foundation Reinforcement
Partial ApprovalInspectorPeter Akmenkalns
4 coulums on D 2 3 4 6
- Jan 6, 2026
Footing
Partial ApprovalInspectorPeter Akmenkalns
permiter foundation wall 6-9 A-B.5
- Jan 6, 2026
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorPeter Akmenkalns
- Dec 31, 2025
Poured Foundation Reinforcement
CancelledInspectorTedd Nelson
- Dec 30, 2025
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Dec 30, 2025
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Dec 30, 2025
Poured Foundation Reinforcement
Partial ApprovalInspectorTedd Nelson
- Lower level foundation wall pour at Grid: 1; C to E
- Dec 30, 2025
Footing
Partial ApprovalInspectorTedd Nelson
- Pads at Grids: 5C, 5D, 6C, 6D
- Dec 30, 2025
Poured Wall/Column (above grade)
Partial ApprovalInspectorTedd Nelson
- Column at slab level, Grids: 5A and 6A
- Dec 29, 2025
Footing
CancelledInspectorPeter Akmenkalns
snow storm deylaed on schedule for tomorrow
- Dec 23, 2025
Poured Wall/Column (above grade)
Partial ApprovalInspectorRick Chase
Grid A 2,3 & 4 West wall Grid B1 between D& E generally 50 LF
- Dec 19, 2025
Poured Foundation Reinforcement
CancelledInspectorTedd Nelson
- Dec 18, 2025
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Dec 18, 2025
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Dec 18, 2025
Footing
Partial ApprovalInspectorTedd Nelson
- Pads at Grids: 3B, 3C, 3D, 3E, 3F, 4B, 4C, 4D, 4E, 4F
- Dec 18, 2025
Poured Foundation Reinforcement
Partial ApprovalInspectorTedd Nelson
- P2 level poured wall at Grids: A; 4 to 6,5
- Dec 17, 2025
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Dec 17, 2025
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Dec 17, 2025
Footing
Partial ApprovalInspectorTedd Nelson
- Pad at Grid E3
- Dec 16, 2025
Poured Foundation Reinforcement
Partial ApprovalInspectorTedd Nelson
- P2 level poured wall at Grids: A; 1 to 4 - Center knee wall between the elevator and stair shaft
- Dec 16, 2025
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Dec 16, 2025
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Dec 16, 2025
Footing
Partial ApprovalInspectorTedd Nelson
- Pad at Grid E2
- Dec 9, 2025
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Dec 9, 2025
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Dec 9, 2025
Footing
Partial ApprovalInspectorTedd Nelson
- Continuous footing at Grids: A; 1 to 3.5 and 1; A to C.5
- Dec 5, 2025
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Dec 5, 2025
Footing
Partial ApprovalInspectorTedd Nelson
- Elevator and stair pad - Elevator drain pipe is installed
- Dec 5, 2025
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Dec 4, 2025
Footing
CancelledInspectorTedd Nelson
- Dec 2, 2025
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Dec 2, 2025
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Dec 2, 2025
Footing
Partial ApprovalInspectorTedd Nelson
- Continuous footing at Grid: A; 3.5 to 6.5 - Pads at Grids: A3, A4, A5, A6
- Nov 26, 2025
Footing
Partial ApprovalInspectorPeter Akmenkalns
permiter strip footings NE corner including 2 pads on interior and 6 in strip footing: A 6.5 9 E-.5
- Nov 26, 2025
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorPeter Akmenkalns
- Nov 26, 2025
Construction Fence
Partial ApprovalInspectorPeter Akmenkalns
- Nov 20, 2025
Footing
Partial ApprovalInspectorTedd Nelson
- Tower crane pad
- Nov 20, 2025
Construction Fence
Partial ApprovalInspectorTedd Nelson
- Nov 20, 2025
Erosion Ctrl/Const Entrance
Partial ApprovalInspectorTedd Nelson
- Nov 20, 2025
Preconstruction
Progress ReportInspectorTedd Nelson
- Conversation with the JS Craig on how the footing, wall and pad pours are going to go
- Nov 18, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorPeter Akmenkalns
- Nov 18, 2025
Footing
Partial ApprovalInspectorPeter Akmenkalns
rat slab to set forms on for crane pad