Building
5513 Brookview Ave, Edina
Other Demolition (645-649), ESCROW PAID
- Dec 29, 2025
Escrow
Approved, w/ CommentsInspectorLindsay Evans
OK to issue escrow refund. Per Water Resources: Per City records, a well is unlikely on the lot. If a well is encountered during construction, it must meet the rules set in the City’s Private Well Policy
- Dec 29, 2025
Building Final
Approved, w/ CommentsInspectorNate Borwege
Escrow refund of $2500 Approved.
- Dec 22, 2025
Escrow
Progress ReportInspectorLindsay Evans
Received online escrow refund request. Working to process.
- Dec 19, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Dec 19, 2025
Construction Fence
ApprovedInspectorLindsay Evans
- Dec 11, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Dec 11, 2025
Construction Fence
ApprovedInspectorLindsay Evans
- Dec 5, 2025
Escrow
Progress ReportInspectorLindsay Evans
Sent contractor an email with the link for escrow refund.
- Dec 4, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Dec 4, 2025
Construction Fence
ApprovedInspectorLindsay Evans
- Nov 25, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Nov 25, 2025
Construction Fence
ApprovedInspectorLindsay Evans
- Nov 17, 2025
Demo Final
Approved, w/ CommentsInspectorLindsay Evans
No inspection called in for full Demo Final so using the Approved Footing inspection from New Home permit #ED225525 that Tedd did on 11/17/25
- Nov 17, 2025
Erosion Ctrl/Const Entrance
Progress ReportInspectorLindsay Evans
Seasonal Inspection - overall site looks good, site sign is up, no IP to remove - Should install double row of bio log around stockpile if it will be there for a while ( I will check back after foundation has been backfilled) - Clean up street at end of day as there is some trackout present
- Nov 7, 2025
Demo`d Home Hole before filled
ApprovedInspectorGodwin Annin
- house demoed and hole ok to fill
- Nov 6, 2025
Construction Fence
ApprovedInspectorLindsay Evans
- Nov 6, 2025
Erosion Ctrl/Const Entrance
Progress ReportInspectorLindsay Evans
demo complete, finishing to remove all debris
- Nov 4, 2025
Erosion Ctrl/Const Entrance
Progress ReportInspectorLindsay Evans
in process of demo
- Nov 3, 2025
Erosion Ctrl/Const Entrance
Progress ReportInspectorLindsay Evans
Have not started the demo yet. crews were on-site doing tree/brush removal. Lots of debris in the street but actively cleaning up when I drove by
- Oct 24, 2025
Tree Plan
Approved, w/ CommentsInspectorLindsay Evans
See tree protection escrow permit- NRMP ED225117, removing 2 trees on site. No mitigation required. No trees being preserved. LB
- Oct 24, 2025
Preconstruction
Approved, w/ CommentsInspectorLindsay Evans
Site looked good. EC in place (bio logs). Site sign up. Using existing driveway until demo is complete or no longer sufficient. No IP installed at this time (weather and closest CB is relatively far away). Pre demo photos uploaded in PDox. Per Water Resources: Per City records, a well is unlikely on the lot. If a well is encountered during construction, it must meet the rules set in the City’s Private Well Policy
- Oct 24, 2025
Tree Protection (call 952-826-0308)
No Inspection RequiredInspectorLindsay Evans
No trees preserved on-site
- Oct 15, 2025
Residential Redevelopment Coordinator
No Inspection RequiredInspectorLindsay Evans
Since a New Home permit is not in process, you are required to have the following inspections upon completion of the demo and prior to receiving the escrow refund. - Inspection of hole after removal of all debris prior to filling (Building Inspections, 952-826-0372) - Demo Final after filling hole and appropriate grading is complete (Building Inspections, 952-826-0372) - Engineering Final after stabilizing all disturbed soils (Engineering Dept. 952-903-5728) - Tree Final (Forestry Dept. 952-826-0308)