#ED225229

Building

318 Madison Ave S, Edina

IssuedNov 21, 2025
StatusUnknown
Value$425,000
Inspections17
Scope of work

New, NEW HOME

Location context
Fees & payments
Total fees$2,125
Total paid$2,125
Timeline
ApprovedNov 17, 2025
IssuedNov 21, 2025
Inspection record
Inspections17
Passed17
Failed0
  1. Mar 2, 2026

    Insulation

    Approved

    InspectorBrian Crask

    PM inspection
  2. Mar 2, 2026

    Weather Barrier/Flashing

    Approved

    InspectorBrian Crask

  3. Feb 25, 2026

    Framing-New Home

    Approved

    InspectorTedd Nelson

  4. Feb 13, 2026

    Floor Slab

    Approved

    InspectorTedd Nelson

  5. Dec 18, 2025

    Foundation Pre-Backfil

    Approved

    InspectorBrian Crask

  6. Dec 18, 2025

    Foundation Pre-backfil (Top of foundation survey)

    Approved

    InspectorBrian Crask

  7. Dec 16, 2025

    Foundation Pre-backfil (Top of foundation survey)

    Partial Approval

    InspectorBrian Crask

    As-built TOF survey was submitted. The As-built TOF matches the proposed TOF. Need Drain tile approved for full approval
  8. Dec 16, 2025

    Foundation Pre-Backfil

    Not Approved

    InspectorBrian Crask

    Missing drain tile rock. Note: Foundation insulation and waterproofing are approved.
  9. Dec 12, 2025

    Foundation Pre-Backfil

    Not Approved

    InspectorBrian Crask

    Not ready
  10. Dec 11, 2025

    Poured Foundation Reinforcement

    Approved

    InspectorGodwin Annin

  11. Dec 8, 2025

    Footing

    Approved

    InspectorBrian Crask

  12. Dec 8, 2025

    Erosion Ctrl/Const Entrance

    Approved, w/ Comments

    InspectorBrian Crask

    Contractor planning to sweep the street at end of work day.
  13. Dec 8, 2025

    Construction Fence

    Approved, w/ Comments

    InspectorBrian Crask

    Contractor planning to reestablish safety fence at end of work day.
  14. Dec 5, 2025

    Erosion Ctrl/Const Entrance

    Approved

    InspectorBrian Crask

  15. Dec 5, 2025

    Construction Fence

    Approved

    InspectorBrian Crask

    Contractor on-site is planning to reestablish the safety fence at the end of the day.
  16. Dec 5, 2025

    Shoring needs to be done before footing inspection

    Approved

    InspectorBrian Crask

  17. Nov 4, 2025

    Preconstruction

    Approved, w/ Comments

    InspectorLindsay Evans

    Site looked good. EC in place (bio logs). Site sign up. Rock entrance installed in front (no entrance/exit installed for access from alley). No IP required at this time (there is an IP device installed in a CB in the alley, however, there is also a road project currently going on and may have been installed for that - unsure). Pre construction photos uploaded in PDox. *Bio log in the street in front of rock entrance area will need to be removed. Per Water Resources: Per City records, a well is unlikely on the lot. If a well is encountered during construction, it must meet the rules set in the City’s Private Well Policy.