Permit / Edina← Search
#ED226740Building
6224 Ewing Ave S, Edina
IssuedJan 8, 2026
StatusUnknown
Value$22,000
Inspections18
Scope of work
Other Demolition (645-649)
Location context
Loading map…
199 nearby
This permitNearby
Fees & payments
Total fees$110
Total paid$110
Timeline
ApprovedJan 8, 2026
IssuedJan 8, 2026
Inspection record
Inspections18
Passed14
Failed0
- Apr 1, 2026
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Mar 27, 2026
Escrow
Progress ReportInspectorLindsay Evans
Sent contractor an email with the link for escrow refund.
- Mar 24, 2026
Construction Fence
Approved, w/ CommentsInspectorLindsay Evans
No longer needed
- Mar 24, 2026
Erosion Ctrl/Const Entrance
Not ApprovedInspectorLindsay Evans
Clean up street in front of site, including the curbline
- Mar 11, 2026
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Mar 9, 2026
Construction Fence
ApprovedInspectorLindsay Evans
- Mar 9, 2026
Erosion Ctrl/Const Entrance
Progress ReportInspectorLindsay Evans
clean up street near entrance
- Feb 25, 2026
Construction Fence
ApprovedInspectorLindsay Evans
- Feb 25, 2026
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Feb 13, 2026
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Feb 13, 2026
Construction Fence
ApprovedInspectorLindsay Evans
- Feb 5, 2026
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Feb 5, 2026
Construction Fence
ApprovedInspectorLindsay Evans
- Jan 30, 2026
Demo Final
Approved, w/ CommentsInspectorLindsay Evans
No inspection conducted for Demo Final so using the Approved Footing inspection from New Home permit #ED224357 that Godwin did on 1/30/26
- Dec 22, 2025
Tree Plan
Approved, w/ CommentsInspectorLindsay Evans
See Tree Protection Escrow Permit ED224395: Preserving 6 trees on site LB
- Dec 19, 2025
Tree Protection (call 952-826-0308)
Progress ReportInspectorLindsay Evans
No tree protection has been installed at this time.
- Dec 19, 2025
Residential Redevelopment Coordinator
No Inspection RequiredInspectorLindsay Evans
Site Restoration Plan submitted during plan review. New Home permit application in process, however, if not Approved and construction of New Home will not begin within 30 days of demo, additional inspections required in order to obtain the Escrow Refund. - Inspection of hole after removal of all debris prior to filling (Building Inspections, 952-826-0372) - Demo Final after filling hole and appropriate grading is complete (Building Inspections, 952-826-0372) - Engineering Final after stabilizing all disturbed soils (Engineering Dept. 952-903-5728) - Tree Final (Forestry Dept. 952-826-0308)
- Dec 19, 2025
Preconstruction
Approved, w/ CommentsInspectorLindsay Evans
Site looked good. EC in place (bio logs). Site sign up. Using existing driveway until demo is complete (however, appeared that a small section near the road has already been removed - may need to add rock in that area for proper entrance). No IP required at this time due to weather. Pre demo photos uploaded in PDox. Per Water Resources: Per City records, a well is unlikely on the lot. If a well is encountered during construction, it must meet the rules set in the City’s Private Well Policy