PULLFIRST[THE RECORD]
Permit / Apple Valley← Search
#AV131420

Plumbing

7707 147th St W, Apple Valley

IssuedNov 25, 2024
StatusUnknown
Value$19,500
Inspections8
Scope of work

Kitchen Remodel, 3 compartment sink Grease interceptor 1 compartment sink Hand sink in service area Hand sink in prep

Location context
Parcel018120004010
Coordinates44.73522, -93.22188
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$101.55
Total paid$101.55
Timeline
ApprovedNov 22, 2024
IssuedNov 25, 2024
Inspection record
Inspections8
Passed1
Failed0
  1. May 14, 2025

    Final - 30 minutes

    Compliant

    InspectorChris Pequin

  2. Apr 11, 2025

    Manometer

    Compliant

    InspectorChris Pequin

  3. Apr 11, 2025

    Final - 30 minutes

    Partial Pass

    InspectorChris Pequin

    Interior remodel of kitchen to new layout. Matches approved plans. Need to reinspect 1 sink that is now being changed out because the faucet is leaking. Check at building final. Need grease interceptor maintenance form.
  4. Dec 17, 2024

    Rough In

    Compliant

    InspectorChris Pequin

    5# of air on DWV. Matching state approved plans. Missing insulation on HW supply piping (to be reinspected on building permit)
  5. Dec 13, 2024

    Underground

    Compliant

    InspectorChris Pequin

  6. Dec 13, 2024

    Air Test

    Compliant

    InspectorChris Pequin

    5#. Isolated new floor drain since the rest had already been air tested the day prior
  7. Dec 12, 2024

    Air Test

    Non-Compliant

    InspectorChris Pequin

    Not able to do inspection because the contractor has chosen to cancel the floor drain in the cooler. Since the underground plumbing no longer matches the state approved plans it must get new approval from DLI. A reinspection must occur once the state approves the newly revised plans and they are resubmitted into Project Dox.
  8. Nov 27, 2024

    Underground

    Non-Compliant

    InspectorChris Pequin

    Air test only holding 4#. Grease interceptor on isometric drawings is only capturing waste from 3 comp sink but installation has it downstream of multiple other fixtures. No cooler floor drain or clean out installed. No ice maker floor drain installed. Need new interceptor spec sheet. Installation does not match isometric drawings. Unless installation completely matches state approved isometric drawings a new state review will be required to ensure system is designed properly.

Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.