Timeline
ApprovedOct 8, 2024
IssuedOct 8, 2024
Inspection record
Inspections20
Passed19
Failed0
- Dec 3, 2025
Bldg Final 1 Hour
PassInspectorTerry Enstad
- Aug 11, 2025
Bldg Final 1 Hour
Partial PassInspectorTerry Enstad
Do not issue C of O until Engineering Dept Releases their HOLD on the site for issues that must be resolved
- Jun 3, 2025
Blower Door Test
PassInspectorTerry Enstad
- Jun 3, 2025
Draintile
PassInspectorTerry Enstad
- Jun 3, 2025
Exterior Weather Barrier ( On-site ) + Photos
PassInspectorTerry Enstad
- Jun 3, 2025
Basement Ceiling Mech Rough-in
PassInspectorTerry Enstad
- Jun 3, 2025
Foundation/Pre-Backfill
PassInspectorTerry Enstad
- Jun 3, 2025
Pan Flashing
PassInspectorTerry Enstad
- Jun 3, 2025
Bldg Final 1 Hour
Call for Re-inspectionInspectorTerry Enstad
TEMP C-O final grade and driveway and sidewalk and fence around pool
- May 15, 2025
Stucco/Lathe
PassInspectorJon Gruender
- Feb 3, 2025
Basement Insulation
PassInspectorTerry Enstad
- Feb 3, 2025
Insulation
PassInspectorTerry Enstad
- Jan 30, 2025
Basement Framing
PassInspectorTerry Enstad
- Jan 30, 2025
Framing 1 Hour
PassInspectorTerry Enstad
- Nov 19, 2024
Deck/Porch Footing
PassInspectorMike Uttenhove
- Nov 6, 2024
Under Slab/Radon
PassInspectorMike Uttenhove
- Oct 28, 2024
Foundation Insul
PassInspectorTerry Enstad
- Oct 23, 2024
Foundation Wall Pour
PassInspectorTerry Enstad
- Oct 21, 2024
Footing
PassInspectorTerry Enstad
- Oct 15, 2024
Erosion Control
PassInspectorTerry Enstad
Dumping issue on neighbor's property i talked with Dean the homeowner he said it was OK to reach out and pull debris back on to property and do not disturb prairie grass at grade.rack final grade.