Permit / Apple Valley← Search
#AV129304Building
7577 138th St W, Apple Valley
IssuedSep 4, 2024
StatusUnknown
Value$357,450
Inspections20
Scope of work
Dwelling, 3440 SF Total/1278 SF 1st Floor/1720 SF 2nd Floor/ 442 SF Garage
Location context
Parcel017595107050
Coordinates44.75011, -93.21910
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$658.63
Total paid$658.63
Timeline
ApprovedAug 30, 2024
IssuedSep 4, 2024
Inspection record
Inspections20
Passed4
Failed1
- Feb 4, 2026
Final - 30 minutes
CompliantInspectorChris Pequin
- Jan 27, 2026
Final - 30 minutes
Non-CompliantInspectorChris Pequin
Stair risers cannot have a variance of more than 3/8 inch from the lowest rise to largest rise for a flight of stairs (7 1/4 and 7 3/4 present). Discussed alternative options approved by the building official for a landing at base of stairs to accommodate 8 1/2 rise at bottom of stairs.
- Jan 26, 2026
Final - 30 minutes
Non-CompliantInspectorChris Pequin
Landing at base of stairs only measures 24 inches deep. Updated survey required and dispute with neighbor regarding retaining wall must be resolved. Tempered film on window must be verified.
- Oct 3, 2025
Final - 30 minutes
Non-CompliantInspectorChris Andrejka
stair risers must be within 3/8" of all stairs on a run and no more than 7 3/4" high. a continuous handrail is required on the stairs. window fall protection is required on all windows on the second level that sills sit under 24" above the floor. the picture window in the owner bathroom must be tempered. the roof venting at the ridge must have the aggregate openings verified. the venting at the ridge must be 1sq ft per 150 sft of roof area.
- Jun 3, 2025
Lath
PassInspectorCraig Schultz
corrections are made
- Jun 2, 2025
Lath
Non-CompliantInspectorCraig Schultz
1. the lath on the left side of the walk door is sideways, not the correct direction, change. 2. tape the edges of the D paper through the corners to the brick mold on both sides of the walk door. call for reinspection
- May 1, 2025
Lath
FailInspectorCraig Schultz
1. need self-furring lath, this is not. 2. need 2 layers of grade D paper, this in not. Remove what is here and install correct material and call for reinspection. Install D paper with label visible for inspection
- Apr 2, 2025
Insulation
CompliantInspectorChris Pequin
Batt/poly throughout with sprayfoamed rims and net and blown floors.
- Mar 24, 2025
Framing - 60 minutes
CompliantInspectorChris Pequin
engineered fixes provided from truss company
- Mar 18, 2025
Framing - 60 minutes
Non-CompliantInspectorChris Pequin
Anchor bolts missing within 12 inches of ends of bottom plates and in intervals exceeding 6 feet. Missing PF straps on garage door. Missing joist hanger nails in some hangers for floor of upstairs deck (visible on main level). Sleepers require 3 toenailed nails. Missing nail plate at bottom plate by laundry standpipe upstairs. Rafter tie missing upstairs by bathroom on West side of home. Missing rafter tie by NW corner. Roof truss A1SG is in the wrong location. Floor truss F1GT not laminated correctly and now not possible (need approval from truss company on fix). Missing joist hanger nails where F2GT is above stairs.
- Mar 13, 2025
Ice & Water
Partial PassInspectorChris Pequin
Digital submission of ice and water underlayment extending from eave to ridge across entire roof.
- Mar 5, 2025
Wrap Inspection
CompliantInspectorChris Pequin
- Feb 26, 2025
Framing - 60 minutes
Partial PassInspectorChris Pequin
Wall bracing as per plan
- Feb 21, 2025
Framing - 60 minutes
Non-CompliantInspectorChris Pequin
Called for a wall bracing inspection. Entire home is CS WSP however whole home has staples for fasteners. 8D nails required 6" on edge and 12" in field.
- Oct 18, 2024
Footing
CompliantInspectorPatrick Devery
Interior grade beam at stair wall.
- Sep 24, 2024
Foundation/Water Proofing
CompliantInspectorPatrick Devery
Insulation added to top of slab, tapered at top.
- Sep 23, 2024
As Built
CompliantInspectorEvan Acosta
- Sep 17, 2024
Poured Wall
CompliantInspectorPatrick Devery
- Sep 17, 2024
Footing
Partial PassInspectorPatrick Devery
Everything but grade beam. Engineering for poured wall received.
- Sep 16, 2024
Footing
Correct and ProceedInspectorChris Pequin
Footing layout has changed slightly by front entry but does not affect layout. New plans showing the change on Page A02 must be approved. Concrete contractor on site had engineering provided for step foundation due to elevation change. Engineering packet must be uploaded to project dox as well. Strip footing not completed yet and will require separate footing inspection. OK to pour perimeter footing. Revised plans required prior to strip footing. Contractor pouring at own risk.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.