Permit / Apple Valley← Search
#AV130771Building
5759 Ellice Tr, Apple Valley
IssuedOct 17, 2024
StatusUnknown
Value$15,000
Inspections6
Scope of work
Deck, 0sf new-Replacement
Location context
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$48.45
Total paid$48.45
Timeline
ApprovedOct 17, 2024
IssuedOct 17, 2024
Inspection record
Inspections6
Passed2
Failed0
- Jun 30, 2025
Final - 30 minutes
PassInspectorCraig Schultz
correction is made
- Jan 2, 2025
Deck Framing
CompliantInspectorPatrick Devery
- Jan 2, 2025
Final - 30 minutes
Non-CompliantInspectorPatrick Devery
A continuous handrail is required on one side of stairs with more than 4 risers. If an additional handrail is added, it must return at top and bottom (34" to 38" measured vertically from leading edge of tread).
- Nov 26, 2024
Deck Framing
Non-CompliantInspectorChris Andrejka
in accordance with the manufacturer's installation instructions stair stringers for Trex Transend must be spaced a maximum of 12"OC.
- Nov 13, 2024
Deck Framing
Partial PassInspectorChris Andrejka
main framing of deck and ledger connection to solid filled CMU block per fastener manufacturer's instructions. waiting for stair framing and lateral load connections. lateral load connections must use approved fasteners for concrete.
- Oct 23, 2024
Deck Footings
CompliantInspectorChris Andrejka
3 footings per plan, dry and 47 degrees.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.