Permit / Apple Valley← Search
#AV129312Building
15300 Cedar Ave, Apple Valley
IssuedJan 30, 2025
StatusUnknown
Value$1,120,260
Inspections15
Scope of work
New Tenant, Remodel of an existing space.
Location context
Parcel017105101020
Coordinates44.72819, -93.21766
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$1,983.33
Total paid$1,983.33
Timeline
ApprovedNov 7, 2024
IssuedJan 30, 2025
Inspection record
Inspections15
Passed7
Failed0
- Jul 23, 2025
Final - 60 minutes
CompliantInspectorChris Pequin
- Jul 22, 2025
Special Inspection
CompliantInspectorChris Pequin
Final SI report recieved
- Jul 22, 2025
Framing - 60 minutes
CompliantInspectorChris Pequin
- Jul 22, 2025
Final - 60 minutes
Non-CompliantInspectorChris Pequin
Awaiting balance report for mechanical permit
- Jul 8, 2025
Wrap Inspection
CompliantInspectorChris Pequin
Water resistive membrane installed and sealed
- Jul 2, 2025
Framing - 60 minutes
Non-CompliantInspectorChris Pequin
Structural clips on Page S01 cannot exceed 24" OC. Reinspect later today.
- Jun 25, 2025
Footing
CompliantInspectorChris Pequin
Final slab reinforcement. #4 dowels 24 OC with vapor barrier.
- Jun 23, 2025
Special Inspection
Partial PassInspectorChris Pequin
Received report from EAT referencing weld for column to roof. Need new structural page matching on site conditions.
- Jun 9, 2025
Footing
Partial PassInspectorChris Pequin
Need SI report from prepour inspection. Reinforcement locations bored as per structural engineers plans. All verticals epoxied and set. Finishing up #3s and top locations for pier foundation. OK to pour with photos.
- Jun 3, 2025
Framing - 60 minutes
Partial PassInspectorChris Pequin
RTU reinforcement is per structural plan S4. Still need special inspection report from 3rd party sent to chris.pequin@applevalleymn.gov Special inspection reports must be emailed within 3 days of each special inspection.
- Apr 10, 2025
Framing - 60 minutes
Partial PassInspectorChris Pequin
Revised plans received/approved for DMs office. All interior partitions approved and can be rocked. Mechanical for offices can be seen later above ceiling. Still need to see structural framing for front facade.
- Mar 20, 2025
Insulation
CompliantInspectorChris Pequin
HW supply piping
- Mar 20, 2025
Framing - 60 minutes
Partial PassInspectorChris Pequin
Approving interior partitions for bathroom and office and raised ceiling in break room. Need SI reports when available for front of house at entrance and trash pad. Need to inspect structural reinforcement of ceiling for RTUs.
- Mar 18, 2025
Framing - 60 minutes
Partial PassInspectorChris Pequin
Interior partitions for bathrooms and office only
- Mar 7, 2025
Framing - 60 minutes
Partial PassInspectorChris Pequin
Rebar embedment for trenches with rebar every 24 inches and vapor barrier
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.