Permit / Apple Valley← Search
#AV132483Building
13630 Georgia Dr, Apple Valley
IssuedFeb 7, 2025
StatusUnknown
Value$60,000
Inspections9
Scope of work
Miscellaneous, 0 SF New - Above Garage Bedroom Build
Location context
Parcel012245004040
Coordinates44.75119, -93.21395
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$234.13
Total paid$234.13
Timeline
ApprovedFeb 7, 2025
IssuedFeb 7, 2025
Inspection record
Inspections9
Passed2
Failed0
- Jan 30, 2026
Insulation
CompliantInspectorChris Andrejka
hvac rough in passed.
- Jan 30, 2026
Wrap Inspection
CompliantInspectorChris Andrejka
- Jan 30, 2026
Ice & Water
CompliantInspectorChris Andrejka
- Jan 30, 2026
Final - 30 minutes
Non-CompliantInspectorChris Andrejka
missing smoke detector on main level and co detectors within 10' of all bedrooms on upper level.
- Jun 27, 2025
Insulation
Non-CompliantInspectorCraig Schultz
1. need a polyethylene vapor barrier on the entire ceiling and seal(caulk) to the wall poly vapor barrier. call for reinspection before covering. insulation is in place electrical inspector approved electrical rough-in
- Jun 23, 2025
Insulation
Partial PassInspectorChris Andrejka
spray foam in rim at roof, 2" foam in floor with 8" batt insulation filling remaining cavity (>R30).
- Jun 17, 2025
Framing - 30 minutes
Partial PassInspectorCraig Schultz
1. still need to provide from the LVL manufacturer's requirements of lag bolt fastening for multiple members, simpson lags were called out in the MFG's installation instructions and the contractor used a different brand lag. the other corrections are made, engineering is provided for the added point load from the 2nd floor header/beam. It is approved to insulate floor and walls, Do not cover floor and wall insulation until we inspect the insulation and vapor barrier contractor said he is working on getting the lag information from the LVL manufacturer
- May 21, 2025
Framing - 30 minutes
Non-CompliantInspectorCraig Schultz
1. squash block on each side of the I-joists in the floor system where there are loads coming down from above. 2. have engineer give a correction for the substituted lags in the 4 ply header, fastenmaster was used, the engineer called out simpson fasteners. 3. the load from upper floor header ends at floor with no support in floor system for the load, have engineer provide a correction for that. Submit changes to office for approval before scheduling a reinspection. lateral braces match roof truss specs-none required per mfg. braces are in place per engineer on the roof trusses
- Feb 12, 2025
Framing - 30 minutes
Non-CompliantInspectorChris Andrejka
4 ply 18" LVL must be fastened with through bolts per the manufacturer's installation instructions (can see fix at next inspection). the beam is carried down to block on the outside garage wall to the foundation. the beam on the common wall/house side has been carried down to a wooden foundation where the 2x6 posts have been continued down within the wood foundation wall to the footing. A letter from the Engineer is required addressing the wooden foundation.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.