#AV131982

Building

13073 Diamond Path, Apple Valley

IssuedMar 17, 2025
StatusUnknown
Value$1,200,000
Inspections16
Scope of work

Dwelling, First flr 1903 SF, Second flr 1877 SF, LL 1531 SF, Garage 1035 SF, Front porch 85 SF.

Location context
Parcel014430001030
Coordinates44.76039, -93.16078
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$2,078.13
Total paid$2,078.13
Timeline
ApprovedMar 17, 2025
IssuedMar 17, 2025
Inspection record
Inspections16
Passed4
Failed0
  1. Oct 14, 2025

    Final - 30 minutes

    Compliant

    InspectorPatrick Devery

    New survey reviewed showing retaining wall at rear of property- measured and not in filtration basin.
  2. Sep 23, 2025

    Framing - Basement

    Not Applicable/Required

    InspectorChris Pequin

  3. Aug 26, 2025

    Lath

    Compliant

    InspectorPatrick Devery

    Second level area at north wall of front entrance.
  4. Aug 18, 2025

    Lath

    Partial Pass

    InspectorPatrick Devery

    East side of house at second level above garage.
  5. Aug 5, 2025

    Lath

    Partial Pass

    InspectorPatrick Devery

    North face of west side of house (opposite face of deck).
  6. Jul 30, 2025

    Lath

    Partial Pass

    InspectorCraig Schultz

    grade d paper in place, self furring lath in place, weep screed is in place, will be calling for other areas on house chimney and room in attic wall above garage overhead doors
  7. Jun 18, 2025

    Insulation

    Compliant

    InspectorChris Pequin

  8. Jun 10, 2025

    Framing - 60 minutes

    Compliant

    InspectorChris Pequin

  9. Jun 9, 2025

    Framing - 60 minutes

    Non-Compliant

    InspectorChris Pequin

    In floor heat air test must pass to approve. Deck currently temped and 6X6s not installed yet. Verified all exterior braced walls. In basement a few areas were missing anchor bolts. The blocking between C02 and its piggybacks do not match engineers cut sheets.
  10. May 30, 2025

    Footing

    Compliant

    InspectorChris Pequin

    2, 24 inch sonotubes for deck 42 inches deep
  11. Apr 29, 2025

    Footing

    Compliant

    InspectorChris Pequin

    Revised engineering provided for elevator pit and horizontal #4 bar added as per plans. Verified radon vapor barrier seals while on site.
  12. Apr 23, 2025

    Footing

    Non-Compliant

    InspectorChris Andrejka

    elevator pad does not match engineered plans. the plans called for two rows of #4 bar (6"oc top, 4"oc bottom) the thickness of the pad does not allow the addition of a second grid of rebar. updated engineering will need to be submitted for review and approval through projectdox.
  13. Apr 7, 2025

    Foundation/Water Proofing

    Compliant

    InspectorPatrick Devery

  14. Apr 3, 2025

    As Built

    Compliant

    InspectorEvan Acosta

  15. Apr 1, 2025

    Poured Wall

    Compliant

    InspectorChris Pequin

    Forms in place. Width and reinforcement matching plan page S1 for foundation engineering from Oswell.
  16. Mar 27, 2025

    Footing

    Partial Pass

    InspectorChris Pequin

    20 inch forms throughout with pad locations matching plans. Missing midspan footing for deck. Need to inspect elevator pad reinforcement prior to covering. Need as built to engineering (evan.acosta@applevalleymn.gov)