PULLFIRST[THE RECORD]
Permit / Apple Valley← Search
#AV131388

Building

15690 English Ave, Apple Valley

IssuedMay 5, 2025
StatusUnknown
Value$3,500,000
Inspections31
Scope of work

Retail, Les Schwab Tire Center

Location context
Parcel015589101020
Coordinates44.71927, -93.17889
Loading map…
200 nearby
This permitNearby
Fees & payments
Total fees$3,000
Total paid$3,000
Timeline
ApprovedApr 10, 2025
IssuedMay 5, 2025
Inspection record
Inspections31
Passed17
Failed0
  1. Feb 9, 2026·10:30 AM - 11:30 AM

    Final - 60 minutes

    scheduled

    InspectorChris Pequin

  2. Feb 5, 2026

    Ice & Water

    Compliant

    InspectorChris Pequin

    Roof walk
  3. Jan 8, 2026

    Framing - 60 minutes

    Compliant

    InspectorChris Pequin

    Rest of Warehouse Inspected
  4. Jan 8, 2026

    Insulation

    Compliant

    InspectorChris Pequin

    Demising wall separating sales center and warehouse
  5. Oct 29, 2025

    Framing - 60 minutes

    Partial Pass

    InspectorChris Pequin

    Revised architectural plans received. Sales center framing is compliant only. Need to verify structural framing in warehouse.
  6. Oct 23, 2025

    Insulation

    Partial Pass

    InspectorChris Pequin

    HW piping insulation
  7. Oct 21, 2025

    As Built

    Not Applicable/Required

    InspectorChris Pequin

  8. Oct 21, 2025

    Footing

    Compliant

    InspectorChris Pequin

  9. Oct 21, 2025

    Foundation/Water Proofing

    Compliant

    InspectorChris Pequin

  10. Oct 21, 2025

    Poured Wall

    Compliant

    InspectorChris Pequin

  11. Oct 21, 2025

    Wrap Inspection

    Compliant

    InspectorChris Pequin

  12. Oct 21, 2025

    Framing - 60 minutes

    Non-Compliant

    InspectorChris Pequin

    Need updated architectural plans in Project Dox for sales center. Electrical RI must pass. Need to inspect roof concentrated load bracing. Need to inspect roof bracing to girder beam. Upon approval from electrical inspector you are OK to rock sales center but leave one side exposed where all HW piping is for insulation inspection.
  13. Sep 26, 2025

    Insulation

    Partial Pass

    InspectorChris Pequin

    Below slab vapor barrier
  14. Sep 24, 2025

    Footing

    Partial Pass

    InspectorChris Pequin

    Trench drains and scissor lifts as per S201
  15. Sep 19, 2025

    Footing

    Partial Pass

    InspectorChris Pequin

    Trash enclosure gate piers fixed and to proper depth
  16. Sep 18, 2025

    Foundation/Water Proofing

    Partial Pass

    InspectorChris Pequin

    Sales vapor barrier
  17. Sep 16, 2025

    Foundation/Water Proofing

    Non-Compliant

    InspectorChris Pequin

    West side door #4 exceeds 18 oc Trash enclosure piers not matching approved plans
  18. Sep 8, 2025

    Insulation

    Partial Pass

    InspectorChris Pequin

    CCF for parapet sections on roof
  19. Sep 4, 2025

    Framing - 60 minutes

    Partial Pass

    InspectorChris Pequin

    Roof parapet framing over sales center
  20. Aug 26, 2025

    Footing

    Partial Pass

    InspectorChris Pequin

    Trash enclosure footings 36 wide 3 #5s top and bottom. Need to see gate enclosure piers still.
  21. Jul 14, 2025

    Poured Wall

    Compliant

    InspectorChris Pequin

    Last remaining exterior foundation walls on SS of building over WF2.0 and WF1.5
  22. Jul 9, 2025

    Footing

    Partial Pass

    InspectorChris Pequin

    Entire SS exterior footings (WF2 & WF1.5). Last remaining footing is interior strip WF1.5 monolithic.
  23. Jul 8, 2025

    Framing - 60 minutes

    Partial Pass

    InspectorChris Pequin

    Another CMU reinforcement inspection on NS wall.
  24. Jul 7, 2025

    Framing - 60 minutes

    Partial Pass

    InspectorChris Pequin

    NS wall CMU reinforcement (6 courses to section requiring roof truss embedment)
  25. Jul 3, 2025

    Framing - 60 minutes

    Partial Pass

    InspectorChris Pequin

    SMU lintles (ML3s) for two large windows on NS of building. Reinforcement for next courses of block on rest of NS.
Show 6 earlier inspections
  1. Jul 1, 2025

    Framing - 60 minutes

    Partial Pass

    InspectorChris Pequin

    ML3.0 for NS overhead door
  2. Jun 30, 2025

    Framing - 60 minutes

    Not Ready

    InspectorChris Pequin

    GC not ready for partial lintel inspection. Requested me to stop back at 11am.
  3. Jun 27, 2025

    Framing - 60 minutes

    Partial Pass

    InspectorChris Pequin

    Still need Braun reports. I must be on the mailing list (chris.pequin@applevalleymn.gov) Inspected CMU reinforcement for NS of building (courses 6-12). Next inspection should be lintels.
  4. Jun 20, 2025

    Framing - 60 minutes

    Partial Pass

    InspectorChris Pequin

    CMU reinforcement for North wall 6 courses (~4 feet) up. 16 OC #5s with pilaster ties horizontally.
  5. Jun 10, 2025

    Poured Wall

    Non-Compliant

    InspectorChris Pequin

    All 8 inch poured walls for W2 footing locations (grid C-D, 1-9) match structural engineers plans. The service bay entrances require another horizontal bar at the top of the form (W1.5 locations). Need Braun to reinspect the w1/5 locations reinforcement prior to pouring concrete (Braun inspector on site currently awaiting concrete truck). Workers already adding top horizontal for w1.5s while I was still on site.
  6. Jun 5, 2025

    Footing

    Partial Pass

    InspectorChris Pequin

    All interior pad footings inspected with reinforcement as indicated on S100 (F4, F5, F6, F6.5, WF1.5, WF2). Exterior footings inspected from grid C-D, 1-9. Need to still inspect exterior footings from A-C, 1-9.