Building
15690 English Ave, Apple Valley
Retail, Les Schwab Tire Center
- Feb 9, 2026·10:30 AM - 11:30 AM
Final - 60 minutes
scheduledInspectorChris Pequin
- Feb 5, 2026
Ice & Water
CompliantInspectorChris Pequin
Roof walk
- Jan 8, 2026
Framing - 60 minutes
CompliantInspectorChris Pequin
Rest of Warehouse Inspected
- Jan 8, 2026
Insulation
CompliantInspectorChris Pequin
Demising wall separating sales center and warehouse
- Oct 29, 2025
Framing - 60 minutes
Partial PassInspectorChris Pequin
Revised architectural plans received. Sales center framing is compliant only. Need to verify structural framing in warehouse.
- Oct 23, 2025
Insulation
Partial PassInspectorChris Pequin
HW piping insulation
- Oct 21, 2025
As Built
Not Applicable/RequiredInspectorChris Pequin
- Oct 21, 2025
Footing
CompliantInspectorChris Pequin
- Oct 21, 2025
Foundation/Water Proofing
CompliantInspectorChris Pequin
- Oct 21, 2025
Poured Wall
CompliantInspectorChris Pequin
- Oct 21, 2025
Wrap Inspection
CompliantInspectorChris Pequin
- Oct 21, 2025
Framing - 60 minutes
Non-CompliantInspectorChris Pequin
Need updated architectural plans in Project Dox for sales center. Electrical RI must pass. Need to inspect roof concentrated load bracing. Need to inspect roof bracing to girder beam. Upon approval from electrical inspector you are OK to rock sales center but leave one side exposed where all HW piping is for insulation inspection.
- Sep 26, 2025
Insulation
Partial PassInspectorChris Pequin
Below slab vapor barrier
- Sep 24, 2025
Footing
Partial PassInspectorChris Pequin
Trench drains and scissor lifts as per S201
- Sep 19, 2025
Footing
Partial PassInspectorChris Pequin
Trash enclosure gate piers fixed and to proper depth
- Sep 18, 2025
Foundation/Water Proofing
Partial PassInspectorChris Pequin
Sales vapor barrier
- Sep 16, 2025
Foundation/Water Proofing
Non-CompliantInspectorChris Pequin
West side door #4 exceeds 18 oc Trash enclosure piers not matching approved plans
- Sep 8, 2025
Insulation
Partial PassInspectorChris Pequin
CCF for parapet sections on roof
- Sep 4, 2025
Framing - 60 minutes
Partial PassInspectorChris Pequin
Roof parapet framing over sales center
- Aug 26, 2025
Footing
Partial PassInspectorChris Pequin
Trash enclosure footings 36 wide 3 #5s top and bottom. Need to see gate enclosure piers still.
- Jul 14, 2025
Poured Wall
CompliantInspectorChris Pequin
Last remaining exterior foundation walls on SS of building over WF2.0 and WF1.5
- Jul 9, 2025
Footing
Partial PassInspectorChris Pequin
Entire SS exterior footings (WF2 & WF1.5). Last remaining footing is interior strip WF1.5 monolithic.
- Jul 8, 2025
Framing - 60 minutes
Partial PassInspectorChris Pequin
Another CMU reinforcement inspection on NS wall.
- Jul 7, 2025
Framing - 60 minutes
Partial PassInspectorChris Pequin
NS wall CMU reinforcement (6 courses to section requiring roof truss embedment)
- Jul 3, 2025
Framing - 60 minutes
Partial PassInspectorChris Pequin
SMU lintles (ML3s) for two large windows on NS of building. Reinforcement for next courses of block on rest of NS.
Show 6 earlier inspections
- Jul 1, 2025
Framing - 60 minutes
Partial PassInspectorChris Pequin
ML3.0 for NS overhead door
- Jun 30, 2025
Framing - 60 minutes
Not ReadyInspectorChris Pequin
GC not ready for partial lintel inspection. Requested me to stop back at 11am.
- Jun 27, 2025
Framing - 60 minutes
Partial PassInspectorChris Pequin
Still need Braun reports. I must be on the mailing list (chris.pequin@applevalleymn.gov) Inspected CMU reinforcement for NS of building (courses 6-12). Next inspection should be lintels.
- Jun 20, 2025
Framing - 60 minutes
Partial PassInspectorChris Pequin
CMU reinforcement for North wall 6 courses (~4 feet) up. 16 OC #5s with pilaster ties horizontally.
- Jun 10, 2025
Poured Wall
Non-CompliantInspectorChris Pequin
All 8 inch poured walls for W2 footing locations (grid C-D, 1-9) match structural engineers plans. The service bay entrances require another horizontal bar at the top of the form (W1.5 locations). Need Braun to reinspect the w1/5 locations reinforcement prior to pouring concrete (Braun inspector on site currently awaiting concrete truck). Workers already adding top horizontal for w1.5s while I was still on site.
- Jun 5, 2025
Footing
Partial PassInspectorChris Pequin
All interior pad footings inspected with reinforcement as indicated on S100 (F4, F5, F6, F6.5, WF1.5, WF2). Exterior footings inspected from grid C-D, 1-9. Need to still inspect exterior footings from A-C, 1-9.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.