Scope of work
Porch, 256 SF - Conversion of existing 3-season to 4-season porch.
Location context
Parcel016160001030
Coordinates44.71942, -93.18831
Loading map…
199 nearby
This permitNearby
Fees & payments
Total fees$161
Total paid$161
Timeline
ApprovedDec 23, 2025
IssuedDec 29, 2025
Inspection record
Inspections10
Passed2
Failed0
- Mar 13, 2026
Porch Framing
CompliantInspectorPatrick Devery
Corrections made.
- Mar 13, 2026
Insulation
CompliantInspectorPatrick Devery
- Feb 20, 2026
Porch Framing
Non-CompliantInspectorPatrick Devery
-Sheathing not nailed as required by engineer. -Diagonal wind braces not installed. -East bearing wall shows (3) 2x10 header required. Approved plans for previous screen porch show (2) 11 7/8" LVL. Adjust plan to show header required. -West bearing wall shows (2) 2x10 header required. Approved plan for previous screen porch shows (2) 11 7/8" LVL. Adjust plan to show required header. -The gable end shows (2) 2x10 required, no header present. Previous screen porch shows (2) 2x10 required. Adjust plan to show required header at this location.
- Feb 17, 2026
Insulation
Partial PassInspectorPatrick Devery
Floor insulation.
- Feb 17, 2026
Footing
CompliantInspectorPatrick Devery
2 new footings at house formed to most recent engineered plan.
- Feb 17, 2026
Floor Framing
CompliantInspectorPatrick Devery
New (3) 2x10 beam away from house.
- Feb 3, 2026
Footing
Non-CompliantInspectorChris Pequin
Footings still do not measure 24X30. The 24 inch measurement should start at the edge of the drain tile (hence why the engineers plans say it is to accommodate drain tile). The measurement should be 24 inches out from the drain tile and 30 inches the other way (parallel to the house). An additional fee may be charged if footings fail again on the next inspection. Do not pour concrete.
- Jan 23, 2026
Footing
Partial PassInspectorChris Pequin
In addition to the previous poured footing correction from 1-20-26, a helical torque report was submitted and is compliant for the 3 new helical piers installed on the south edge of the addition.
- Jan 20, 2026
Footing
Non-CompliantInspectorChris Pequin
Revised engineering received and states 24X30 footing to accommodate drain tile. The base of the footing does not measure 24X30. Base of footing is not at frost depth 42 inches. I would except the footing to be formed to keep it separate from the draintile (otherwise concrete will make draintile useless at that point). Do not pour concrete until reinspection.
- Jan 14, 2026
Footing
Correct and ProceedInspectorChris Andrejka
there are two concrete pier footings on the plan against the home that do not have a footing size called out. the footings are 20" down to the bottom of the walkout's strip footing. there is drain tile running through the center of the new footing holes. the engineer needs to add these footing sizes to the plans and address the drain tile through the footings. a workflow will be opened in projectdox for the updated engineered plans.