Building
3601 55th St W, Edina
New, New Home with deck
- Mar 13, 2026
Lath
ApprovedInspectorBrian Crask
Contractor submitted photos of a 3/8" gap/expansion joint between the wood casing and the stucco.
- Feb 20, 2026
Lath
Approved, w/ CommentsInspectorBrian Crask
Contractor planning to submit photos of a 3/8" gap/expansion joint between the wood casing and the stucco.
- Dec 2, 2025
Framing-New Home
Not ApprovedInspectorBrian Crask
Updated list of framing corrections: -Need fireplace rough-in inspection done before framing can be approved. Note: Pictures for GB braced wall were submitted and approved. Everything else is okay
- Nov 24, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
Fall Inspection Site is OK (Inspected by Drew Hollister)
- Nov 24, 2025
Floor Slab
ApprovedInspectorBrian Crask
Note: Photos submitted of poly/vapor barrier in mud room. Approved.
- Nov 24, 2025
Framing-New Home
Not ApprovedInspectorBrian Crask
Updated list of framing corrections. -Need fireplace rough-in inspection done before framing can be approved. -Need GB braced wall inspection Everything else is okay
- Nov 24, 2025
Insulation
Not ApprovedInspectorBrian Crask
Approved pending framing approval Note: the interior side of the foundation is spray foamed.
- Nov 21, 2025
Erosion Ctrl/Const Entrance
Not ApprovedInspectorLindsay Evans
Fall Inspection Remove inlet protection Remove signs from city ROW (Inspected by Drew Hollister)
- Nov 20, 2025
Framing-New Home
Not ApprovedInspectorBrian Crask
Okay to insulate. -Need full approval of floor slab inspection for framing approval. -Need fireplace approved before framing inspection. -Need pressure test for all gas lines before framing inspection.
- Nov 20, 2025
Bldg Progress
Progress ReportInspectorBrian Crask
Revised garage portal frame engineering by PE Nick Hanson dated 11-17-25 was submitted and approved.
- Nov 17, 2025
Erosion Ctrl/Const Entrance
Not ApprovedInspectorLindsay Evans
Fall Inspection Remove inlet protection (Inspected by Drew Hollister)
- Nov 14, 2025
Framing-New Home
Partial Approval w/ CommentsInspectorBrian Crask
Okay to insulate. -Need full approval of floor slab inspection for framing approval. -Need fireplace approved before framing inspection. -Need pressure test for all gas lines before framing inspection. -Garage header missing top plate, per plan. Contractor planning to submit a revised engineered design.
- Nov 7, 2025
Weather Barrier/Flashing
ApprovedInspectorBrian Crask
- Nov 7, 2025
Framing-New Home
ApprovedInspectorBrian Crask
-Need fireplace approved before framing inspectin. -Need pressure test for all gas lines before framing inspection. -Floor truss under family room need engineered turss fix completed -Garage header missing top plate, per plan -Need full braced wall inspection, including missing hold-down at side of portal frame and blocking over braced wall between house and garage. -Need top plate continuity at header in back left room.
- Nov 7, 2025
Foundation Pre-backfil (Top of foundation survey)
ApprovedInspectorScot Jandro
As-built TOF 874.100 vs proposed 874.5000
- Sep 5, 2025
Erosion Ctrl/Const Entrance
ApprovedInspectorLindsay Evans
- Jun 23, 2025
Floor Slab
Partial ApprovalInspectorBrian Crask
-Missing poly/vapor barrier in mudroom. -Need As-built TOF inspection before floor slab inspection can be approved.
- May 27, 2025
Erosion Ctrl/Const Entrance
Not ApprovedInspectorLindsay Evans
Site sign needs to be put back up Install proper rock entrance/exit Clean the street Re-establish EC along front of site
- May 27, 2025
Foundation Pre-Backfil
Partial ApprovalInspectorScot Jandro
Pending TOF survey
- May 21, 2025
Poured Foundation Reinforcement
ApprovedInspectorGodwin Annin
- additional foundation wall poured.
- May 12, 2025
Erosion Ctrl/Const Entrance
Not ApprovedInspectorScot Jandro
Provide rock construction entrance.
- May 12, 2025
Foundation Pre-Backfil
Partial ApprovalInspectorScot Jandro
Ok to backfill partial foundation where is ready. All foundation and backfill pend on TOF survey. Front section of wall not formed/poured.
- May 6, 2025
Poured Foundation Reinforcement
Partial ApprovalInspectorBrian Crask
-Exterior walls of house and garage are approved. -All interior poured walls are still TBD, including the elevator shaft.
- May 1, 2025
Footing
ApprovedInspectorGodwin Annin
- May 1, 2025
Shoring needs to be done before footing inspection
ApprovedInspectorGodwin Annin
Show 1 earlier inspection
- Apr 1, 2025
Preconstruction
Approved, w/ CommentsInspectorLindsay Evans
Site looked good. EC in place (bio logs). Site sign up. Rock entrance installed. IP installed in catch basin ID 9281. Pre construction photos uploaded in PDox. Per Water Resources: Per City records, a sealed well is on the lot. If additional wells are encountered during construction, it must meet the rules set in the City’s Private Well Policy.