2-Family/Duplex
32 LAWTON ST, Saint Paul
HPC - CONSTRUCT EXTERIOR STAIRCASE FROM EXISTING DECK TO GROUND LEVEL AS A SECOND MEANS OF EGRESS FOR THE 2ND FLOOR CONDO. THIS REPLACES THE ORIGINAL EXTERIOR STAIRCASE OF THE STRUCTURE. UTILIZE GREEN TREATED GROUND CONTACT LUMBER, DARK TONE TREX TRANCEND DECKING. AFCO BLACK RAILINGS, TREX STAIR LIGHTING, DIAMOND PIER DP 50 FOOTINGS, WRAP The following "Trade" Permits are required for this project: Electrical, The following "Trade" Permits are required for this project: Electrical, 7/9/24: Mailed permit, placard & Stamped drawings – AC
No inspections recorded.