Commercial · Minneapolis · Permit BLDG1135556
Flat Roof - Single-ply Membrane General requirements for flat roof replacements. The roof covering is to meet the Minnesota Building code performance requirements of Section 1504, the fire classification of Section 1505 and the material requirements as
Commercial · Saint Paul · Permit 25-030156
N/A. N/A. GLORIA'S AUTO CAREFULLY REMOVE CAP METAL FOR REUSE. TEAR OFF OF EXISTING DURALAST ROOFING AND INSULATION DOWN TO THE DECK AND INSPECT DECK AND PREPARE AREA. ROOF IS STRUCTURALLY SLOPED AND INSULATED ON THE INSIDE. INSTALL 2 LAYERS 2.5" ISO INSULATION PANELS MECHANICALLY USING 3" METAL PLATES AND SCREWS. INSTALL FULLY-ADHERED TPO ROOFING SYSTEM. REINSTALL CAP METAL TO COMPLETE JOB 05.12.25 MAILED OUT PERMIT/PLACARD AND STAMPED DRAWINGS
L DSI PM BD - L DSI PM BD · Saint Paul · Permit 25-030156
L DSI PM BD
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.