Mar 17, 2026·1522 SELBY AVELikely
Residential Building Remodel by Licensed Contractor · Saint Paul · Permit DSIBLDRC-028396-2026
Underpin bowed foundation wall (16')
-Install supports and remove 16 feet of bowing limestone foundation wall
-Install new footing (8"x20"x20')
-Install 9 courses of 12inch CMU block (130)
-corefill entire wall with concrete
-Install horizontal and vertical rebar @36"
-Install engineered columns on each end to bond with new foundation
-Install new green treated plate
-Install anchor bolts every 4' to attach new foundation to existing structure
***NOTE Plans are attached