Building · Saint Louis Park · Permit SL371186
Principal Building, Bathroom remodel
Res · Minneapolis · Permit BLDG1165411
Bathroom remodel -ACW SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. THIS WORK MUST BE COMPLETED BY A LICENSED CONTRACTOR IN A MULTI-FAMILY DWELLING. CARBON MONOXIDE ALARMS REQUIRED IN ACCOR
Building · Saint Louis Park · Permit SL368313
Principal Building, Reside House and Garage
Building · Saint Louis Park · Permit SL362616
Principal Building, Add 3/4 bath in basement
Res · Minneapolis · Permit BLDG1063868
DEMO EXISTING 5'x3' WOOD-FRAMED STAIRWAY AT COMMON FRONT DOOR ENTRY TO TFD (UNITS 305 & 308). CONSTRUCT NEW APPROX. 19' LONG TREATED WOOD STAIRWAY WITH 3'x5' TOP LANDING ATTACHED TO DWELLING, FIVE 2'-3"x3'-3" LOW RISE TREADS, AND 5'x4' BOTTOM LANDING ALO
Building · Saint Louis Park · Permit SL346409
Principal Building, Remodel of main floor entry/bedroom closet space
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.