Res · Minneapolis · Permit BLDG1132904
ENCLOSED EXISTING OPEN PORCH TO THREE SEASONED PORCH IN EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS) - INSTALL NEW PARTITION WALLS, ADD FIVE (5) WINDOWS AND ONE (1) STORM DOOR TO EXISTING OPEN PORCH TO ENCLOSED NEW THREE SEASONED PORCH AS
L DSI PM BD - L DSI PM BD · Saint Paul · Permit 25-055126
L DSI PM BD
Res · Minneapolis · Permit BLDG1106014
CODE COMPLIANCE ORDERS PLAN17903 CONVERT SFD TO TFD Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. SMOKE
L DSI PM BD - L DSI PM BD · Saint Paul · Permit 25-030875
L DSI PM BD - L DSI PM BD · Saint Paul · Permit 25-022177
L DSI PM BD - L DSI PM BD · Saint Paul · Permit 24-098463
Res · Minneapolis · Permit BLDG1089617
(DMH-ProjectDox) INTERIOR REHAB TO 1-STORY SFD STARTED WITHOUT PERMIT . 2 BASEMENT BEDROOMS AND BATHROOM. WORK COMPLETED OR OMITTED IN VIOLATION OF THE BUILDING CODE SHALL BE CORRECTED AS DIRECTED BY THE BUILDING INSPECTOR. APPROVED PL
Res · Minneapolis · Permit BLDG1060468
NOTE: Non-habitable space: stairs do not meet the required egress height of 6'-4 ". Adding 2 rooms in bsmt The building inspector must confirm conditions are compliant with all requirements listed in the attached Basement Bulletin including egress window
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.