Building · Edina · Permit ED228191
Alteration/Remodel, INTERIOR KITCHEN REMODEL
Residential Building Remodel by Licensed Contractor · Saint Paul · Permit DSIBLDRC-026907-2026
Remodel of Existing Kitchen, Replace Cabinets in Place. No Structural changes, no mechanical changes.
Commercial · Minneapolis · Permit BLDG1160875
Combination of two adjacent retail storefront spaces through a new non-load bearing opening. Demolition, New Flooring, New Walls -ACW certificate of occupancy required: no special inspections required: no const type: 1A occupancy:
Residential Building Remodel by Licensed Contractor · Saint Paul · Permit DSIBLDRC-020022-2025
Remodel of First Level Kitchen and Second Level Bathrooms and Installation of New Windows
Residential Building Remodel by Licensed Contractor · Saint Paul · Permit DSIBLDRC-001098-2025
Remodel of Existing Basement: Adding 3/4 Bathroom, Sauna, Interior Walls, Egress Window. PAPER PLANS FILED BY ADDRESS.
Residential Building Remodel by Licensed Contractor · Saint Paul · Permit DSIBLDRC-005268-2025
Residential Remodel
Res · Minneapolis · Permit BLDG1145159
(6) New Windows
Building · Edina · Permit ED224217
Alteration/Remodel, Remodel in current place, two bathrooms at Second Level of House.
Res · Minneapolis · Permit BLDG1134680
KITCHEN REMODEL (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. SMOKE ALARMS REQUIRED IN ACCORDANCE W
Res · Minneapolis · Permit BLDG1134567
remodel kitchen, dining room, and sunroom. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. SMOKE ALARMS REQUIR
Res · Minneapolis · Permit BLDG1136336
FLAT ROOF. (JJL)
Res · Minneapolis · Permit BLDG1118390
STAIR RAILINGS+SIDING+12 NEW WINDOWS (MAA) GENERAL COMMENTS: APPLICANT MUST LOCATE AND IDENTIFY THE PROPERTY STAKES AND CALL FOR INSPECTION FOR BUILDING INSPECTOR VERIFICATION BEFORE CONCRETE IS POURED. APPROVED SITE PLAN AND PERMIT MUST BE ON SITE
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.