Res · Minneapolis · Permit BLDG1162363
(DMH-Pdox) REMOVE PARITION WALLS BETWEEN DINING AND HALLWAY IN SFD AND INSTALL NEW BEAM PER ENGINEER. ENGINEER OF RECORD: DEREK PHILLIPS, #47507 APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. APPLICANT IS REQUIRED TO
Building · Saint Louis Park · Permit SL367202
Principal Building, Finish upstairs attic into a master bedroom and bathroom with build in storage.
Building · Apple Valley · Permit AV136171
Basement Finish, 154sf new-Finishing roughed in bathroom, adding closet, bathroom wall with door and electrical
Res · Minneapolis · Permit BLDG1109466
ADD BATHROOM ON 2ND FLOOR (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. SMOKE ALARMS REQUIRED IN AC
Res · Minneapolis · Permit BLDG1094138
*********Basement is non- habitable due to ceiling height not meeting 6'4" requirement per field inspector - 8-20-25******************** Add a front entrance covered, open sided, porch. Remodel 2 existing bathrooms and kitchen. Add a new bedroom
Res · Minneapolis · Permit BLDG1087524
(DMH-ProjectDox) INSTALL NEW PERIMETER FRAMING IN BASEMENT OF SFD AND NEW PARTITION WALLS AND FINISHES FOR LAUNDRY AND 3/4 BATHROOM. NOT REVIEWED FOR ANY BASEMENT BEDROOM. APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDE
Res · Minneapolis · Permit BLDG1072529
BASEMENTREMODEL*****************NO BEDROOMS********************** (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATI
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.