Mar 11, 2026·3605 Tanglewood Ct
Remodel / Renovation / Relocation · Eagan · Permit 2603-00068-BL
Upstairs master bathroom remodel. Remove current drop in tub, removing the tub deck and surround. Framing new short stub walls and installing a 60" alcove style tub in same location as existing tub. Removing existing shower and installing new solid surface shower in the same location as existing shower. Removing cabinetry and flooring installing new cabinetry and tile flooring, new toilet and sinks. everything in the bathroom is to stay in its existing locations. Plumbing to be done by Hessian Plumbing, Electrical to be done by Bryan's Electric.