Saint Paul, MN
Saint Paul, MN
11 SUMMIT COURT, Saint Paul
APARTMENT #9 WINDOW REPLACEMENT
1524 SUMMIT AVE, Saint Paul
INTERIOR REMODELING TO ADD NEW RAMP AND REMOVE EXISTING CEILING AT RECITAL HALL
596 SUMMIT AVE, Saint Paul
HPC - RE-ROOF FLAT ROOF
1960 SUMMIT AVE, Saint Paul
1ST FLOOR BATH REMODEL. UPDATED FINISHES - NO STRUCTURAL 2018-09-14: new vent fan, new lights at toilet & shower, new vanity, countertop, mirror & lighting. new gfi outlet next to existing light switch. Remove tile & walls around shower/tub area. Remove soffit over tub. New cement back. new 4"x4"tile w/plywood backer in walls for grab bar support. new toilet, bathtub and lavatory. 8' ceiling. MI per provided documents. The following "Trade" Permits are required for this project: Electrical, W.Air Vent, Plumbing,
943 SUMMIT AVE, Saint Paul
BATHROOM REMODEL The following "Trade" Permits are required for this project: Electrical, Plumbing,
295 SUMMIT AVE, Saint Paul
HPC - SUITE #1 - WINDOW (REPLACEMENT)
266 SUMMIT AVE, Saint Paul
HPC - REPAIR BRICKWORK & RE-POINT
1894 SUMMIT AVE, Saint Paul
43' INTERIOR DRAIN TILE, 2 BSKT, PUMP, ENCAP The following "Trade" Permits are required for this project: Electrical,
1838 SUMMIT AVE, Saint Paul
RE-ROOF: house and garage
445 SUMMIT AVE, Saint Paul
TUCK POINTING, REPAIR GATE
682 SUMMIT AVE, Saint Paul
INTERIOR DEMO IN KITCHEN AND BATHROOM INCLUDING REMOVAL OF COUNTERTOPS, VANITY AND CABINETS
705 SUMMIT AVE, Saint Paul
HPC - REPLACE ROOF UNDERLAYMENT UNDER TILE ROOF
1873 SUMMIT AVE, Saint Paul
HPC DRAIN TILE
408 SUMMIT AVE, Saint Paul
HPC - TEMPORARY STRUCTURE AT LOOKOUT PARK TO ELEVATE AWARENESS OF MEDTRONIC'S SPONSORSHIP OF THE TWIN CITIES MARATHON, FOR THE FOURTH YEAR IN A ROW WE WILL ENGAGE RUNNERS BY INSTALLING A MEDTRONIC BRANDED TUNNEL LOCATED AT MILE 25-1/4 OF THE RACE. THE TUNNEL WILL CONSIST OF 54'L X 20'H TRUSS STRUCTURE WITH A DOUBLE-SIDED IMPRINT ON 30% AIR WAVE MESH
875 SUMMIT AVE, Saint Paul
INTERIOR RENOVATIONS
495 SUMMIT AVE, Saint Paul
HPL - GRIND & TUCKPOINT AND REPLACE BAD BRICKS, REMOVE REBUILD 4" OF GARAGE CHIMNEY
2115 SUMMIT AVE BLDG UST, Saint Paul
N/A. HPC - JR ROACH CENTER - RE-ROOFING
1317 SUMMIT AVE, Saint Paul
RE-ROOF
1344 SUMMIT AVE, Saint Paul
HPC - UPTOWN - PARTIAL REPLACEMENT OF FRONT PORCH DECKING. See HP folders: 16-031210 and 12-213171
1567 SUMMIT AVE, Saint Paul
HPC - TEAR OFF AND REROOF GARAGE/CARRIAGE HOUSE
1623 SUMMIT AVE, Saint Paul
HPC MINOR TUCKPOINTING AND BRICK REPLACEMENT
1434 SUMMIT AVE, Saint Paul
HPC - BATHROOM REMODEL AND TILE The following "Trade" Permits are required for this project: Electrical, Plumbing,
2020 SUMMIT AVE, Saint Paul
HPC - REAR ADDITION, REMODEL KITCHEN, CLOSE IN SECOND FLOOR PORCH The following "Trade" Permits are required for this project: Electrical, W.Air Vent,
2260 SUMMIT AVE BLDG UST, Saint Paul
HPC FACILITY DESIGN CENTER TI BUILDOUT TO ADD (1) CLASSROOM TO THE 1ST FLOOR OF THE FACILITIES DESIGN CENTER BUILDING.
591 SUMMIT AVE, Saint Paul
HPC--------(14) WINDOW REPLACEMENT.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.